Checking the control link and throt-
tle link position
1.
Remove the throttle cable.
2.
Measure the length of control link rod
1
.
3.
Measure the length of throttle link rod
2
.
4.
Adjust the length of the link rod if out of
specification.
Synchronizing the carburetor
1.
Remove the throttle cable and intake
silencer cover.
2.
Loosen the throttle stop screw
1
on the
lower carburetor to make a clearance
until the screw tip does not touch the
stopper
2
.
CHK
ADJ
3-5
61U5H11
Periodic check and adjustment
NOTE:
Make a note that how many times you turn
out the throttle stop screw.
3.
Loosen the throttle lever tightening
screws
3
and
4
clockwise.
NOTE:
The screws
3
and
4
are left hand thread.
4.
Make sure that the throttle valves are fully
closed position.
5.
Tighten the throttle lever tightening screw
3
counterclockwise on the upper carbu-
retor.
6.
Turn the throttle stop screw
1
until it con-
tacts the stopper. From this position,
tighten it another 1 1/8 turns further.
7.
Make sure that the mark
5
on the accel-
erator cam align with the center of the
roller
6
on the lower carburetor.
Length (reference):
a
: 60 mm (2.36 in)
b
: 53 mm (2.09 in)
61U30070
b
b
2
a
a
61U30060
1
61U30020
1
2
3
4
61U30030
61U30310
5
4
6
61U5H11_03 05.10.13 11:43 AM Page 6
Summary of Contents for 115B
Page 1: ...115B SERVICE MANUAL 61U 28197 5H 11 140B E115A E115A 115B 140B ...
Page 4: ......
Page 79: ...61U5H11 4 18 9 8 7 6 5 4 3 2 1 MEMO ...
Page 136: ...POWR 5 55 61U5H11 Power unit MEMO ...
Page 159: ...61U5H11 6 22 9 8 7 6 5 4 3 2 1 Shimming Shimming 6G46090E T3 M3 M4 M1 M2 T1 T2 F R P ...
Page 255: ......