– 18 –
SPEC
1
ECU
2
Tail/brake light
3
Tail/brake light lead
4
Seat lock cable
5
Fuel tank breather hose
6
Fuel tank overflow hose
7
Air filter case breather hose
È
To the intake air temperature
sensor
É
Fasten the wire harness to the
frame with a plastic locking tie.
Ê
To the inside of the U-lock stor-
age box
Ë
Fasten the tail/brake light lead to
the frame with a plastic locking tie.
Ì
Pass the tail/brake light lead
between the rear cover and
frame.
Í
Pass the wire harness on the
inside of the seat lock cable.
Î
Fasten the wire harness and
wire harness (ECU) with the
clamp attached to the clamp
bracket, which is attached to the
seat lock bracket.
Ï
Pass the air filter case breather
hose, fuel tank breather hose,
and fuel tank over flow hose
through the hose guide.
Ð
Pass the fuel tank breather
hose and fuel tank overflow
hose between the swingarm
and universal joint.
CABLE ROUTING
Summary of Contents for 2003 FJR1300
Page 1: ...2003 FJR1300 R FJR1300A R 5JW1 AE4 SUPPLEMENTARY SERVICE MANUAL ...
Page 2: ......
Page 159: ......
Page 160: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...