CRANKSHAFT
5-69
NOTE:
Identify the position of each crankshaft journal
upper bearing so that it can be reinstalled in its
original place.
EAS24390
CHECKING THE CYLINDER AND PISTON
1. Check:
• Piston wall
• Cylinder wall
Vertical scratches
→
Replace the cylin-
der, and the piston and piston rings as a
set.
2. Measure:
• Piston-to-cylinder clearance
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Measure cylinder bore “C” with the cylinder
bore gauge.
NOTE:
Measure cylinder bore “C” by taking side-to-
side and front-to-back measurements of the
cylinder. Then, find the average of the mea-
surements.
b. If out of specification, replace the cylinder,
and the pistons and piston rings as a set.
c. Measure piston skirt diameter “P” with the
micrometer.
4 mm (0.16 in) “a” from the bottom edge of
the piston
d. If out of specification, replace the piston
and piston rings as a set.
e. Calculate the piston-to-cylinder clearance
with the following formula.
f.
If out of specification, replace the cylinder,
and the piston and piston rings as a set.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
EAS24430
CHECKING THE PISTON RINGS
1. Measure:
• Piston ring side clearance
Out of specification
→
Replace the piston
and piston rings as a set.
NOTE:
Before measuring the piston ring side clear-
ance, eliminate any carbon deposits from the
piston ring grooves and piston rings.
Cylinder bore “C”
77.00 – 77.01 mm
(3.0315 – 3.0319 in)
Wear limit
77.06 mm (3.03 in)
Taper limit “T”
0.005 mm (0.0002 in)
Out of round “R”
0.005 mm (0.0002 in)
“C”
=
maximum of D
1
– D
6
“T”
=
maximum of D
1
or D
2
– maximum
of D
5
or D
6
“R”
=
maximum of D
1
D
3
or D
5
–
minimum of D
2
D
4
or D
6
Piston size “P”
76.975 - 76.990 mm
(3.0305 - 3.0311 in)
Piston-to-cylinder clearance =
Cylinder bore “C” –
Piston skirt diameter “P”
Piston-to-cylinder clearance
0.010–0.035 mm (0.0004–
0.0014 in)
Limit
0.12 mm (0.0047 in)
Summary of Contents for 2008 Fazer FZ1-N
Page 1: ...SERVICE MANUAL FZ1 N X FZ1 S X FZ1 SA FZ1 NA 2008 5D0 28197 E1 ...
Page 6: ......
Page 8: ......
Page 44: ...SPECIAL TOOLS 1 35 ...
Page 63: ...TIGHTENING TORQUES 2 18 ...
Page 69: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 24 ...
Page 72: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 EAS20410 LUBRICATION DIAGRAMS ...
Page 74: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 ...
Page 76: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 ...
Page 78: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 ...
Page 79: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 34 1 Main axle 2 Oil delivery pipe 3 Drive axle ...
Page 80: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 ...
Page 81: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 36 1 Cylinder head 2 Crankshaft ...
Page 82: ...COOLING SYSTEM DIAGRAMS 2 37 EAS20420 COOLING SYSTEM DIAGRAMS ...
Page 83: ...COOLING SYSTEM DIAGRAMS 2 38 1 Water pump 2 Radiator 3 Radiator fan ...
Page 84: ...COOLING SYSTEM DIAGRAMS 2 39 ...
Page 85: ...COOLING SYSTEM DIAGRAMS 2 40 1 Radiator cap 2 Radiator 3 Oil cooler 4 Thermostat ...
Page 86: ...CABLE ROUTING 2 41 EAS20430 CABLE ROUTING ...
Page 88: ...CABLE ROUTING 2 43 MM NN OO FZ1 S X H M M N N O H O FZ1 N X FZ1 S X ...
Page 90: ...CABLE ROUTING 2 45 ...
Page 92: ...CABLE ROUTING 2 47 ...
Page 96: ...CABLE ROUTING 2 51 ...
Page 98: ...CABLE ROUTING 2 53 ...
Page 100: ...CABLE ROUTING 2 55 ...
Page 106: ...CABLE ROUTING 2 61 ...
Page 108: ...CABLE ROUTING 2 63 ...
Page 114: ...CABLE ROUTING 2 69 EE E E F F FF AA A A FZ1 S X ...
Page 116: ...CABLE ROUTING 2 71 ...
Page 118: ...CABLE ROUTING 2 73 ...
Page 121: ......
Page 159: ...ELECTRICAL SYSTEM 3 38 A FZ1 N X FZ1 NA B FZ1 S X FZ1 SA ...
Page 160: ...ELECTRICAL SYSTEM 3 39 ...
Page 163: ......
Page 249: ...INSTALLING THE TRANSMISSION 5 88 ...
Page 366: ...AIR INDUCTION SYSTEM 7 15 ...
Page 370: ...IGNITION SYSTEM 8 1 EAS27090 IGNITION SYSTEM EAS27110 CIRCUIT DIAGRAM ...
Page 374: ...ELECTRIC STARTING SYSTEM 8 5 EAS27160 ELECTRIC STARTING SYSTEM EAS27170 CIRCUIT DIAGRAM ...
Page 380: ...CHARGING SYSTEM 8 11 EAS27200 CHARGING SYSTEM EAS27210 CIRCUIT DIAGRAM ...
Page 381: ...CHARGING SYSTEM 8 12 2 Rectifier regulator 3 AC magneto 6 Main fuse 7 Battery ...
Page 383: ...CHARGING SYSTEM 8 14 ...
Page 384: ...LIGHTING SYSTEM 8 15 EAS27240 LIGHTING SYSTEM EAS27250 CIRCUIT DIAGRAM FZ1 N X ...
Page 386: ...LIGHTING SYSTEM 8 17 EAS5D01027 CIRCUIT DIAGRAM FZ1 S X ...
Page 390: ...SIGNALING SYSTEM 8 21 EAS27270 SIGNALING SYSTEM EAS27280 CIRCUIT DIAGRAM ...
Page 396: ...COOLING SYSTEM 8 27 EAS27300 COOLING SYSTEM EAS27310 CIRCUIT DIAGRAM ...
Page 399: ...COOLING SYSTEM 8 30 ...
Page 400: ...FUEL INJECTION SYSTEM 8 31 EAS27330 FUEL INJECTION SYSTEM EAS27340 CIRCUIT DIAGRAM ...
Page 443: ...FUEL INJECTION SYSTEM 8 74 ...
Page 444: ...FUEL PUMP SYSTEM 8 75 EAS27550 FUEL PUMP SYSTEM EAS27560 CIRCUIT DIAGRAM ...
Page 447: ...FUEL PUMP SYSTEM 8 78 ...
Page 448: ...IMMOBILIZER SYSTEM 8 79 EAS27640 IMMOBILIZER SYSTEM EAS27650 CIRCUIT DIAGRAM ...
Page 457: ...IMMOBILIZER SYSTEM 8 88 ...
Page 462: ...ABS ANTI LOCK BRAKE SYSTEM 8 93 EAS27740 ABS COMPONENTS CHART FZ1 SA ...
Page 464: ...ABS ANTI LOCK BRAKE SYSTEM 8 95 FZ1 NA ...
Page 466: ...ABS ANTI LOCK BRAKE SYSTEM 8 97 EAS27750 ABS CONNECTOR LOCATION CHART FZ1 SA ...
Page 468: ...ABS ANTI LOCK BRAKE SYSTEM 8 99 FZ1 NA ...
Page 476: ...ABS ANTI LOCK BRAKE SYSTEM 8 107 EAS27810 BASIC PROCESS FOR TROUBLESHOOTING ...
Page 500: ...ELECTRICAL COMPONENTS 8 131 EAS27970 ELECTRICAL COMPONENTS ...
Page 502: ...ELECTRICAL COMPONENTS 8 133 ...
Page 504: ...ELECTRICAL COMPONENTS 8 135 EAS27980 CHECKING THE SWITCHES ...
Page 533: ...TROUBLESHOOTING 9 6 ...
Page 538: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...