Pre-operation checks
95
AR190/SX190
TIP:
The number of cooling water pilot outlets
varies according to the model.
AR195/SX195: 3 cooling water pilot outlets
AR190/SX190: 1 cooling water pilot outlet
It may take up to 20 seconds for water to
reach the pilot outlet when first launching
the boat. The amount and force of the exit-
ing water will vary with engine speed.
NOTICE
A continuous flow of water from the pilot
outlet shows that water is flowing through
the engine cooling water passages. If wa-
ter is not flowing out of the pilot outlet dur-
ing operation, do not continue to run the
engine. Overheating and serious damage
could occur. (See “Over temperature
warning” on page 56 for more informa-
tion.)
Fuel level check
Check the amount of fuel remaining in the
fuel tank using the fuel level bar graph on the
multi-function display.
1
Fuel level bar graph
Add fuel if necessary. (See page 79 for infor-
mation on filling the fuel tank.)
am
10:27
FUEL
100
%
12.3V
MPH
0
0.3 Avg MPG
1
SportsBoat_F4V10.book Page 95 Tuesday, July 3, 2018 1:03 PM
Downloaded from