PERIODIC MAINTENANCE AND MINOR REPAIR
6-10
2
3
4
5
6
7
8
9
2. Install the screw access cover by
placing it in its original position.
3. Install the grab bar by installing the
collars and grab bar bolts.
4. Install the passenger seat.
5. Install cowlings A and B.
Cowling E
To remove the cowling
1. Pull up the left floorboard mats as
shown.
2. Remove the cowling screws.
3. Pull the cowling down slightly, and
then pull it outward as shown.
To install the cowling
1. Insert the tabs on the cowling into
the slots as shown, and then install
the screws.
2. Place the left floorboard mats in
the original position.
Tightening torque:
Grab bar bolt:
23 Nm (2.3 m·kgf, 16.6 ft·lbf)
1. Left floorboard mat
1. Screw
1
1
(
×
4)
1. Cowling E
1. Tab
1
1
(
×
13)
1
Summary of Contents for MAJESTY 400
Page 1: ...5RU 28199 10 YP400T OWNER S MANUAL ...
Page 2: ......
Page 7: ...TABLE OF CONTENTS ...
Page 12: ...1 5 ...
Page 13: ...SAFETY INFORMATION 1 6 1 EAU10381 ly before operating this vehicle 2 1 3 5 6 7 4 ...
Page 15: ...SAFETY INFORMATION 1 8 1 ...
Page 17: ...DESCRIPTION 2 2 2 3 4 5 6 7 8 9 EAU10420 5 3 4 ...
Page 80: ...ND MINOR REPAIR 6 39 ...
Page 89: ...SPECIFICATIONS 8 3 2 3 4 5 6 7 8 9 tor fan fuse 0 A onic fuel injection fuse 0 A p fuse 0 A ...
Page 91: ...CONSUMER INFORMATION 9 2 2 3 4 5 6 7 8 9 ...
Page 94: ...9 5 Mileage Servicing dealer name and address Remarks ...
Page 95: ...CONSUMER INFORMATION 9 6 2 3 4 5 6 7 8 9 EAU26661 U S A STREET AND ENDURO MOTORCYCLE LIMITED ...
Page 96: ...9 7 ...
Page 98: ...9 9 benefits of y knowing after your maha with We ll be d ...
Page 100: ......
Page 101: ...YAMAHA MOTOR CO LTD PRINTED IN JAPAN 2004 7 1 7 1 E ...