CRANKSHAFT
5-54
EAS2DM1031
CRANKSHAFT
Removing the crankshaft
Order
Job/Parts to remove
Q’ty
Remarks
Engine
Refer to “ENGINE REMOVAL” on page 5-2.
Cylinder head
Refer to “CYLINDER HEAD” on page 5-7.
Piston
Refer to “CYLINDER AND PISTON” on page
5-25.
Belt drive
Refer to “V-BELT AUTOMATIC TRANSMIS-
SION” on page 5-30.
Oil pump assembly
Refer to “OIL PUMP” on page 5-48.
Transmission
Refer to “TRANSMISSION” on page 5-51.
1
Oil filter element cover
1
2
Oil filter element
1
3
Oil strainer cover
1
4
Spring
1
5
Oil strainer
1
6
Timing chain guide retaining bolt
1
7
Timing chain guide (intake side)
1
8
Left crankcase
1
9
Dowel pin
2
5
4
3
11
9
9
13
12
14
10
7
2
1
15
6
8
(3)
(3)
(5)
New
New
New
New
New
New
New
LS
LS
LS
LS
E
E
E
10 Nm (1.0 m
•
kgf, 7.2 ft
•
Ibf)
T.R.
10 Nm (1.0 m
•
kgf, 7.2 ft
•
Ibf)
T.R.
7 Nm (0.7 m
•
kgf, 5.1 ft
•
Ibf)
T.R.
20 Nm (2.0 m
•
kgf, 14 ft
•
Ibf)
T.R.
20 Nm (2.0 m
•
kgf, 14 ft
•
Ibf)
T.R.
32 Nm (3.2 m
•
kgf, 23 ft
•
Ibf)
T.R.
Summary of Contents for MBK XMAX 2014
Page 1: ...2014 SERVICE MANUAL YP125R YP125RA 2DM F8197 E0 ...
Page 6: ......
Page 8: ......
Page 64: ...TIGHTENING TORQUES 2 17 Muffler tightening sequence 1 2 3 ...
Page 72: ...LUBRICATION SYSTEM DIAGRAMS 2 25 EAS2DM1116 LUBRICATION SYSTEM DIAGRAMS 1 2 3 4 5 3 ...
Page 78: ...CABLE ROUTING 2 31 Steering head front view 1 2 3 4 5 6 8 8 A 7 7 ...
Page 80: ...CABLE ROUTING 2 33 Front brake left side view for YP125R 1 2 2 1 1 2 2 D E A B C ...
Page 82: ...CABLE ROUTING 2 35 Front brake left side view for YP125RA 2 1 1 2 1 2 2 A B D E C ...
Page 92: ...CABLE ROUTING 2 45 Frame right side view 3 2 4 1 2 3 A B 6 5 3 A B 3 3 2 3 3 A A B A B B 3 ...
Page 94: ...CABLE ROUTING 2 47 Engine right side view 6 6 6 6 C D C D D C 10 B 9 5 6 1 2 8 3 4 5 6 7 A ...
Page 98: ...CABLE ROUTING 2 51 Frame left side view C D C D 2 1 E 1 2 D C 6 1 4 5 3 2 1 7 3 2 1 A B ...
Page 100: ...CABLE ROUTING 2 53 Engine left side view 1 1 1 1 1 2 3 4 5 6 7 8 9 7 7 A B A B A B 1 ...
Page 106: ...CABLE ROUTING 2 59 Rear brake right side view 2 2 2 2 2 2 1 1 2 3 A B C 3 ...
Page 110: ...CABLE ROUTING 2 63 ...
Page 228: ...REAR SHOCK ABSORBER ASSEMBLIES AND SWINGARM 4 89 ...
Page 231: ......
Page 291: ...CRANKSHAFT 5 60 a 1 ...
Page 292: ...CRANKSHAFT 5 61 ...
Page 302: ...WATER PUMP 6 9 ...
Page 313: ......
Page 331: ...CHARGING SYSTEM 8 18 ...
Page 349: ...COOLING SYSTEM 8 36 ...
Page 391: ...FUEL PUMP SYSTEM 8 78 ...
Page 400: ...IMMOBILIZER SYSTEM 8 87 a Light on b Light off ...
Page 401: ...IMMOBILIZER SYSTEM 8 88 ...
Page 405: ...ABS ANTI LOCK BRAKE SYSTEM for YP125RA 8 92 ...
Page 439: ...ABS ANTI LOCK BRAKE SYSTEM for YP125RA 8 126 ...
Page 464: ...ELECTRICAL COMPONENTS 8 151 ...
Page 476: ......
Page 477: ......
Page 478: ......