SPEC
9-3
MAINTENANCE SPECIFICATIONS
ENGINE
MAINTENANCE SPECIFICATIONS
18.7 ~ 19.3 cm
3
22.9 ~ 23.5 cm
3
(1.14 ~ 1.18 cu.in)
(1.40 ~ 1.43 cu.in)
<0.03 mm (0.0012 in)>
*Lines indicate straight edge measurement.
Aluminum alloy with dispersion coating
65.000 ~ 65.014 mm
70.500 ~ 70.520 mm
(2.5591 ~ 2.5596 in)
(2.7756 ~ 2.7764 in)
<0.05 mm (0.002 in)>
<0.01 mm (0.0004 in)>
64.930 ~ 64.935 mm
70.425 ~ 70.430 mm
(2.5563 ~ 2.5565 in)
(2.7726 ~ 2.7728 in)
10 mm (0.39 in)
15 mm (0.59 in)
0.065 ~ 0.070 mm
0.070 ~ 0.075 mm
(0.0026 ~ 0.0028 in)
(0.0028 ~ 0.0030 in)
0.1 mm (0.004 in)
0.5 mm (0.02 in)
1.0 mm (0.04 in)
EX side
20.004 ~ 20.015 mm (0.7876 ~ 0.7880 in)
19.995 ~ 20.000 mm (0.7872 ~ 0.7874 in)
55.7 ~ 56.0 mm (2.193 ~ 2.205 in)
Keystone
B = 1.20 mm (0.047 in)
T = 2.55 mm (0.100 in)
Keystone
B = 1.20 mm (0.047 in)
T = 2.55 mm (0.100 in)
0.35 ~ 0.55 mm (0.014 ~ 0.022 in)
0.35 ~ 0.55 mm (0.014 ~ 0.022 in)
0.02 ~ 0.06 mm (0.0008 ~ 0.0024 in)
0.02 ~ 0.06 mm (0.0008 ~ 0.0024 in)
Chrome plated/Ferox c PB1 coat
Chrome plated/Ferox coating
Model
Cylinder head:
Volume (with spark plug)
<Warp limit>
Cylinder:
Material
Bore size
<Taper limit>
<Out-of-round limit>
Piston:
Piston size (D)
Measuring point
a
Piston to-cylinder clearance
<Limit>
Piston offset
Piston offset direction
Piston pin bore inside diameter
Piston pin:
Piston pin outside diameter
Piston pin length
Piston ring:
Sectional sketch
Top Ring
2nd Ring
End gap (installed)
Top Ring
2nd Ring
Side clearance
Top Ring
2nd Ring
Coating
Top Ring
2nd Ring
MM600
MM700
Summary of Contents for MM600D
Page 1: ...MM600D MM700D SERVICE MANUAL LIT 12618 02 12 8EJ 28197 10 981033 ...
Page 47: ...2 34 INSP ADJ CARBURETOR TUNING Guide for carburetion SEJ2750 ...
Page 201: ...SPEC 9 23 CABLE ROUTING SEJ9160 ...
Page 203: ...SPEC 9 25 CABLE ROUTING SEJ9170 ...
Page 205: ...SPEC 9 27 CABLE ROUTING SEJ9180 ...
Page 207: ...SPEC 9 29 CABLE ROUTING SEJ9190 ...
Page 209: ...SPEC 9 31 CABLE ROUTING SEJ9200 ...