2-10
INSP
ADJ
1
1
Inspection steps:
•
Attach the cooling system tester
1
to the
coolant filler
2
.
Cooling system tester:
90890-01325, YU-24460-01
•
Apply 100 ~ 120 kPa (1.0 ~ 1.2 kg/cm
2
, 14 ~ 17
psi).
•
Measure the pressure with the gauge.
Air bleeding
1. Remove:
•
Bleed bolt cap
1
2. Bleed air from the cooling system.
Air bleeding steps:
•
Lift up the tail of the machine.
•
Remove the bleed bolt
1
on the heat ex-
changer.
•
While slowly adding coolant to the coolant
reservoir, drain the coolant until no more air
bubbles appear.
•
Tighten the bleed bolt.
Bleed bolt:
4 Nm (0.4 m • kg, 2.9 ft • lb)
•
Add coolant to the coolant cold level
a
.
•
Loosen the bleed bolt
2
on the thermostatic
cover.
•
Drain the coolant until no more air bubbles
appear.
•
Tighten the bleed bolt
2
.
Bleed bolt
2
:
7 Nm (0.7 m • kg, 5.1 ft • lb)
•
Install the coolant filler cap.
Apply and lock the parking brake. Start the
engine and run it at approximately 2,500 ~
3,000 r/min until the thermostat opens and the
coolant circulates (approximately 3 ~ 5 min-
utes). The rear heat exchanger will be warm to
the touch.
COOLING SYSTEM
T
R
.
.
T
R
.
.
SEJ2170
SEJ2180
SEJ2190
SEJ2200
Summary of Contents for MM600D
Page 1: ...MM600D MM700D SERVICE MANUAL LIT 12618 02 12 8EJ 28197 10 981033 ...
Page 47: ...2 34 INSP ADJ CARBURETOR TUNING Guide for carburetion SEJ2750 ...
Page 201: ...SPEC 9 23 CABLE ROUTING SEJ9160 ...
Page 203: ...SPEC 9 25 CABLE ROUTING SEJ9170 ...
Page 205: ...SPEC 9 27 CABLE ROUTING SEJ9180 ...
Page 207: ...SPEC 9 29 CABLE ROUTING SEJ9190 ...
Page 209: ...SPEC 9 31 CABLE ROUTING SEJ9200 ...