POWR
TR
4-37
3
2
2
1
3
a
b
1
a
b
a
b
SLIDE RAIL SUSPENSION
ASSEMBLY
1. Install:
•
Shaft
1
NOTE:
Ensure the rubber collars
2
are not pinched
between the shaft and sliding frames
3
.
Bolt (shaft)
1
:
72 Nm (7.2 m • kg, 52 ft • lb)
2. Install:
•
Stopper band
1
NOTE:
Install the stopper band with
a
toward the hook
and
b
toward the shaft.
Nut (stopper band):
4 Nm (0.4 m • kg, 2.9 ft • lb)
INSTALLATION
1. Install:
•
Slide rail suspension
NOTE:
Select the rear suspension position according to
the snow conditions:
a
standard;
b
deep new
snow.
Bolt (slide rail suspension):
72 Nm (7.2 m • kg, 52 ft • lb)
SEJ4720
SEJ4730
SEJ4740
T
R
.
.
T
R
.
.
T
R
.
.
Summary of Contents for MM600D
Page 1: ...MM600D MM700D SERVICE MANUAL LIT 12618 02 12 8EJ 28197 10 981033 ...
Page 47: ...2 34 INSP ADJ CARBURETOR TUNING Guide for carburetion SEJ2750 ...
Page 201: ...SPEC 9 23 CABLE ROUTING SEJ9160 ...
Page 203: ...SPEC 9 25 CABLE ROUTING SEJ9170 ...
Page 205: ...SPEC 9 27 CABLE ROUTING SEJ9180 ...
Page 207: ...SPEC 9 29 CABLE ROUTING SEJ9190 ...
Page 209: ...SPEC 9 31 CABLE ROUTING SEJ9200 ...