2-20
INSP
ADJ
ENGAGEMENT SPEED CHECK
1. Place the machine on a level surface of hard-
packed snow.
2. Check:
•
Clutch engagement speed
Checking steps:
•
Start the engine, and open the throttle lever
gradually.
•
Check the engine speed when the machine
starts moving forward.
Out of specification
→
Adjust the primary
sheave.
Engagement speed:
MM600: 4,600
±
200 r/min
(4,400 ~ 4,800 r/min)
MM700: 4,700
±
200 r/min
(4,500 ~ 4,900 r/min)
PARKING BRAKE PAD INSPECTION
1. Measure:
•
Parking brake pad thickness
a
Out of specification
→
Replace as a set.
Wear limit
a
:
6.0 mm (0.24 in)
PARKING BRAKE ADJUSTMENT
1. Measure:
•
Clearance
a
Out of specification
→
Adjust.
Clearance
a
:
1.2 ~ 1.3 mm (0.047 ~ 0.051 in)
2. Adjust:
•
Clearance
a
Adjustment steps:
•
Loosen the locknut
1
.
•
Turn the cable adjuster
5
in or out to until the
specified clearance between the brake pad
6
and disc
4
is obtained.
•
Turn the brake pad adjusting bolt
2
in or out
until the specified clearance between the brake
pad
3
and disc
4
is obtained.
•
Tighten the locknut.
ENGAGEMENT SPEED CHECK/PARKING BRAKE PAD
INSPECTION/PARKING BRAKE ADJUSTMENT
SEJ2420
SEJ2430
SEJ2440
Summary of Contents for MM600D
Page 1: ...MM600D MM700D SERVICE MANUAL LIT 12618 02 12 8EJ 28197 10 981033 ...
Page 47: ...2 34 INSP ADJ CARBURETOR TUNING Guide for carburetion SEJ2750 ...
Page 201: ...SPEC 9 23 CABLE ROUTING SEJ9160 ...
Page 203: ...SPEC 9 25 CABLE ROUTING SEJ9170 ...
Page 205: ...SPEC 9 27 CABLE ROUTING SEJ9180 ...
Page 207: ...SPEC 9 29 CABLE ROUTING SEJ9190 ...
Page 209: ...SPEC 9 31 CABLE ROUTING SEJ9200 ...