background image

PREPARATION

To assemble the machine correctly, supplies and work-
ing space are required:
Supplies Oils, greases, shop rags.

Workshop

The workshop where the machine is assembled should
be clean and large. The floor should be level.

Self-protection

Protect your eyes with suitable safety spectacles or
safety goggles when using compressed air, when grind-
ing or when doing any operation which may cause
particles to fly off.
Protect hands and feet by wearing safety gloves or
doing.

Procedure for unpacking

1. To remove the machine and parts packed in the crate,

cut the vinyl bands around the carton using a cutter or
scissors. Next, remove the exterior carton by lifting it
straight up.

2. Remove the bolts from each corner of the rack, and

remove the struts.

3. Remove the machine from the bottom board.
4. Before starting the assembly, check for damaged or

missing parts. The parts are contained in the carton
and the machine for damage, scratches and other
defects.

PRÉPARATION

Certaines fournitures et conditions sont indispensables
pour monter correctement le véhicule:
Fournitures Huiles, graisses, essuyeurs.

Atelier

L’atelier doit être propre et spacieux. Le sol doit être
plane.

Sécurité

Se protéger les yeux avec des lunettes de protection lors
de l’utilisation d’air comprimé, lors de meulages ou lors
de tout travail entraînant la projection de particules.
Se protéger les mains et les pieds à l’aide de gants et de
chaussures de protection si le travail effectué le permet.

Déballage

1. Pour retirer le véhicule et les pièces emballées dans la

caisse, couper les sangles en plastique à  l’aide de
ciseaux ou d’un cutter. Ensuite, retirer le carton
extérieur en le soulevant tout droit.

2. Retirer les boulons de chacun des coins de la boîte, et

retirer les armatures.

3. Retirer le véhicule du fond de son emballage.
4. Avant de commencer le montage, s’assurer de la

présence et du bon état de toutes les pièces dans le
carton et s’assurer que le véhicule n’est ni endommagé
ni griffé et qu’il ne présente aucun défaut.

Summary of Contents for RAPTOR YFM80WP

Page 1: ...YFM80WP ASSEMBLY MANUAL MANUEL D ASSEMBLAGE 5TH 28107 70...

Page 2: ...death to the machine operator a bystander or a person inspecting or repairing the machine CAUTION A CAUTION indicates special precautions that must be taken to avoid damage to the machine NOTE A NOTE...

Page 3: ...carton and the machine for damage scratches and other defects PR PARATION Certaines fournitures et conditions sont indispensables pour monter correctement le v hicule Fournitures Huiles graisses essuy...

Page 4: ...rt ex 5 0 2 5 mm 0 2 in SYMBOLES EMPLOY S DANS LES NOTICES D ASSEMBLAGE Afin de simplifier les descriptions donn es dans les notices d assemblage les symboles suivants sont employ s Couvriravecunel g...

Page 5: ...s a 5 6 1 2 4 6 5 3 PARTS LOCATION 1 Carton box 2 Vinyl pack 3 Vinyl pack 4 Carton box 5 Rear wheel 6 Front wheel EMPLACEMENT DES PI CES 1 Bo te en carton 2 Emballage en plastique 3 Emballage en plast...

Page 6: ...erette et boulon et rondelle plate pare chocs avant Flange bolt Rear protector Boulon collerette protection arri re Hexagon bolt and spring nut front panel Boulon hexagonal et crou ressort capot avant...

Page 7: ...r reflector 60 mm plain washer and spring washer Catadioptre arri re 60 mm rondelle plate et rondelle ressort et crou 2Vinylpack Emballageenplastique Handlebar cover Cache de guidon 4 Carton box Bo te...

Page 8: ...tires 5 Remove the bolt 9 swingarm 6 Remove the main body from to the lower frame D BALLAGE 1 Retirer l emballage du cadre 1 2 Retirer les boulons 2 les boulons de demi palier de guidon 3 et les ronde...

Page 9: ...5 B 0 A 7 Remove the bolts 0 and bracket A 8 Remove the tube B 7 Retirer les boulons 0 et le support A 8 Retirer le tube B...

Page 10: ...7 0 m kg 51 ft lb Front bumper and front fender 7Nm 0 7 m kg 5 1 ft lb Front bumper and frame 23Nm 2 3 m kg 17 ft lb Front panel and front fender 3Nm 0 3 m kg 2 2 ft lb C Routing of wire cables etc F...

Page 11: ...lb Pare chocs avant et garde boue avant 7Nm 0 7 m kg 5 1 ft lb Pare chocs avant et cadre 23Nm 2 3 m kg 17 ft lb Capot avant et garde boue avant 3Nm 0 3 m kg 2 2 ft lb C CHEMINEMENT DES C BLES FILS ET...

Page 12: ...del is equipped with low pressure tires Refer to ADJUSTMENTS AND PREDELIVERY SERVICE MONTAGE N B Apr s avoir ouvert le conteneur placer le VTT sur un support ad quat et suivre les op rations de montag...

Page 13: ...ES ET FILS A Connect the neutral indicator light connectors NOTE Refer to CABLE ROUTING B Pass the breather hose through the hole on the handlebar cover NOTE Refer to CABLE ROUTING 1 1 1 1 2 2 1 2 3 4...

Page 14: ...1 C 1 C d 8 0 31 R 14 0 55 A Tighten the bolts to the specified torque Tightening torque 23 Nm 2 3 m kg 17 ft lb A Serrer les boulons au couple sp cifi Couple de serrage 23 Nm 2 3 m kg 17 ft lb B 23...

Page 15: ...eur noire la borne A NOTE Before installing the battery refer to ADJUSTMENTS AND PREDELIVERY SERVICE Before connecting the battery leads remove the key from the main switch B First connect the lead re...

Page 16: ...d 5 0 20 60 mm 10 Seat Selle 1 Seat 1 A Insert the lobes on the seat front into the receptacles on the frame then push down the seat at the end A Ins rer les lobes de l avant de la selle dans les pat...

Page 17: ...tank into the hole in the handlebar cover CHEMINEMENT DES C BLES ET FILS ATTENTION Un cheminement correct des c bles et fils est essentiel pour assurer la s curit de la machine 1 Contacteur de feu sto...

Page 18: ...14 I GH D B I A E B CF ADJUSTMENTS AND PREDELIVERY SERVICE R GLAGES ET ENTRETIEN AVANT LIVRAISON...

Page 19: ...OUT OF REACH OF CHILDREN A Contr le de la batterie 1 Charge La batterie doit tre charg e correctement avant la premi re utilisation Cette charge initiale augmentera sa long vit ATTENTION Nejamaisessay...

Page 20: ...CAUTION Make sure that the battery leads are connected properly Reversing leads can seriously damage the electrical system d Connecter la batterie un chargeur de batterie e R gler le d bit du chargeu...

Page 21: ...p rapide peut entra ner un clatement 2 Une pression de gonflage trop faible avant 17 kPa 0 17 kgf cm2 2 5 psi arri re 17 kPa 0 17kgf cm2 2 5psi entra neraled jantage du pneu 3 Les deux pneus arri re d...

Page 22: ...uile moteur 1 Placer la machine sur une surface plane 2 Mettre le moteur en marche le laisser chauffer jusqu 10 secondes apr s que l huile moteur ait atteint sa temp rature de fonctionnement normale d...

Page 23: ...huile jusqu au niveau recommand N B Ne pas visser la jauge 1 lors du contr le du niveau d huile Huile recommand e Huile hypo de SAE 80 API GL 4 Quantit d huile changementd huilep riodique 0 12 L 0 11...

Page 24: ...Adjust Throttle lever free play 3 5 mm 0 12 0 20 in 2 Adjust Pull up the adjuster cover 1 Loosen the locknut 2 Turn the adjuster 3 clockwise or counter clock wise until specified free play attained Cl...

Page 25: ...arri re 1 Contr ler Garde de la p dale de frein arri re a Garde du levier de frein arri re b Hors sp cifications R gler Garde de la p dale de frein arri re 20 30 mm 0 8 1 2 in Garde du levier de frein...

Page 26: ...SOLINE 6 8 L 1 50 Imp gal 1 80 US gal 0 05 0 10 mm 0 0020 0 0039 in 0 075 0 125 mm 0 0030 0 0050 in Parts name Owner s manual Owner s tool kit Low pressure air gauge Q ty 1 1 1 QUIPEMENT STANDARD No 1...

Page 27: ...d frame Front shock absorber and lower arm Steering knuckle and lower arm Steering knuckle and ball joint Steering shaft and ball joint Tie rod and locknut Steering shaft and frame Steering shaft and...

Page 28: ...isseur avant et cadre Amortisseur avant et bras inf rieur Fus e de direction et bras inf rieur Fus e de direction et joint rotule Arbre de direction et joint rotule Barre d accouplement et contre crou...

Page 29: ......

Page 30: ...PRINTED ON RECYCLED PAPER PRINTED IN JAPAN 2001 9 2 2 1 CR E F YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN...

Reviews: