■
Set up example
Printed in Indonesia
WG24090
■
Optional Parts
●
Pad and Drum Trigger Grouping
●
Monitor System and Attachement Grouping
e
PCY150S
Cymbal Pad
q
DTXTREME
II
S
Drum Trigger Module
w
PCY130/130S
Cymbal Pad
t
TP100
Drum Pad
y
TP120SD
Drum Pad
u
KP65
Kick Pad
r
RHH130
Real Hi-hat Pad
i
Foot Pedal
* DFP-9310 etc.
o
Snare Stand
*SS652 etc.
!0
Hi-hat Stand
*HS-740 etc.
• SPAT1
(1 set L/R units)
• TPCL150
• CYAT150
• MS50DR
•
Sub Woofer
amp unit
• MS100DR
•
Sub Woofer
amp unit
•
Satellite
Speakers
•
Satellite
Speakers
Sub Woofer amp unit
t
t
q
i
y
e
w
r
o
!0
u
w
Satellite Speaker
Satellite Speaker
PCY130
PCY150S
PCY130S
Maker sure all bolts on clamps, pads, etc., are tightened firmly.
However, loose or over-tightened bolts may result in the part falling off and/or damage. Please use caution.
After assembly is complete, setup the kick pad, real hi-hat pad, etc., and connect the cables. Use the supplied cable bands to secure the cables
to the frame pipes to keep cables out of the way during performance.
If the rack is moved even after setup is complete, make sure the bolts are loosened before moving the rack.
Attaching the cymbal pads
4
Attach the cymbal pads to the cymbal holders and adjust their
position, then secure in place. (Please refer to the Owner's
Manual that came with the cymbal pads on attaching the cym-
bal pads.)
DTXTREME
II
S
Drum Pad
Cymbal Pad
(PCY130/130S/150S)
Anti-swivel brace
(supplied with the
(PCY130/130S/150S)
Felt
Module
Holder
Step
3-1
Step
3-2
Holder Clamp
Step
5
Step
4
Attaching the DTXTREME
II
S
3
3-1
Remove the module holder from the holder clamp, and
use the supplied screws to attach the DTXTREME
II
S.
Make sure only the supplied screws are used. Using any
other screws may result in the unit falling off the holder
or damage.
3-2
Slide the module holder, with the DTXTREME
II
S already
attached, into the holder clamp.
Attaching the drum pads
5
Attach the drum pads to the tom clamp and adjust their posi-
tion, then secure in place.
Step
3