For Service Engineer
Service Information
SI1705004E-00=SIGMA-G5SII Service Manual
83/273
3. Mechanism
3.1. Nozzle Stocker Unit Change Procedure
3.1.1. Removal of the Nozzle Stocker Unit
(1)
Shut down the power and air source.
(2)
Disconnect the air pipe and power cable connectors.
Nylon Connector (11p): 2 pcs for the sensors
Nylon Connector (4p): 2 pcs for the solenoid valves
*
The above number of each connector shows the value for two nozzle stockers.
(3) Loosen the two set bolts (M6L25) and remove the nozzle stocker unit. (Refer to Fig. C1).
3.1.2. Attachment of the Nozzle Stocker Unit
(1)
Set the nozzle stocker based on the pilot pin. (Refer to Fig. C2).
Press the nozzle stocker to the end in the machine inside direction (transfer side) and
fix it using the two set bolts (M6L25).
(2)
Connect the air piping connector and power cable connector.
(3)
Start supplying air and power to the machine.
Set the nozzle stocker and perform the nozzle stocker position teaching.
Select
"
Shipping Adj
"
,
"
Nozzle Stocker Position
"
and
"
Select Stocker
"
(select the
change location) in this order.
Air Piping
Two Set Bolts
Fig.C1
Fig.C2
Pilot Pins