For Service Engineer
Service Information
SI1705004E-00=SIGMA-G5SII Service Manual
183/273
4.17.5. Fuse Change in the CPU2 I/O Host Board (U85)
Remove the AE-LINK I/O host board (U85) located
in the left end in the CPU2 BOX.
Note:
Removal Procedure
Loosen the setscrews on the upper and lower
sides of the board and push down the up/down
lever, at the same time, press the red section on
the lever.
Pull out the blade fuse and replace it by a new one.
Fig.D110
CPU2BOX
U85 PCB
U85 PCB