–14–
DRIVE V-BELT
INSP
ADJ
2. Adjust the position of the V-belt by removing or
adding a spacer
1
on each adjusting bolt
2
.
V-belt position
Adjustment
More than 1.5 mm
(0.06 in) above the
edge
Remove a spacer
From 1.5 mm
(0.06 in) above the
edge to – 0.5 mm
(– 0.02 in) below
the edge
Not necessary
(It is correct.)
More than – 0.5 mm
(– 0.02 in) below
the edge
Add spacer
3. Tighten:
Adjusting bolt
2
Adjusting bolt
2
:
10 Nm (1.0 m
kg, 7.2 ft
lb)
4. Inspect:
Drive V-belt
Cracks / damage / wear
Replace.
Oil or grease on the V-belt
Check the pri-
mary and secondary sheaves.
5. Inspect:
Primary sheave
Secondary sheave
Oil or grease on the primary and secondary
sheaves
Use a rag soaked in lacquer thin-
ner or solvent to remove the oil or grease.
Check the primary and secondary sheaves.
6. Measure:
Drive V-belt length
a
Out of specification
Replace.
Drive V-belt length
a
:
1,133 mm (44.6 in)
Summary of Contents for SX500D
Page 1: ...SUPPLEMENTARY SERVICE MANUAL ...
Page 85: ... 81 CABLE ROUTING SPEC CABLE ROUTING 500 ...
Page 87: ... 83 CABLE ROUTING SPEC ...
Page 89: ... 85 CABLE ROUTING SPEC ...
Page 91: ... 87 CABLE ROUTING SPEC ...
Page 93: ... 89 CABLE ROUTING SPEC ...
Page 95: ... 91 CABLE ROUTING SPEC ...
Page 97: ... 93 CABLE ROUTING SPEC CABLE ROUTING 600 700 ...
Page 99: ... 95 CABLE ROUTING SPEC ...
Page 101: ... 97 CABLE ROUTING SPEC ...
Page 103: ... 99 CABLE ROUTING SPEC ...
Page 105: ... 101 CABLE ROUTING SPEC ...
Page 107: ... 103 CABLE ROUTING SPEC ...
Page 109: ... 105 CABLE ROUTING SPEC ...
Page 112: ...WIRING DIAGRAM ...
Page 114: ...WIRING DIAGRAM ...