–31–
PRIMARY SHEAVE AND DRIVE V-BELT
POWR
TR
Order
Job name / Part name
Q’ty
Remarks
1
2
3
Primary sheave removal
V-belt
Blind cap
Primary sheave assembly
1
1
1
Remove the parts in the order below.
For installation, reverse the removal
procedure.
120 Nm (12.0 m
kg, 87 ft
lb)
1st
2nd
60 Nm (6.0 m
kg, 43 ft
lb)
A
:
POWER TRAIN
PRIMARY SHEAVE AND DRIVE V-BELT
Summary of Contents for SX500D
Page 1: ...SUPPLEMENTARY SERVICE MANUAL ...
Page 85: ... 81 CABLE ROUTING SPEC CABLE ROUTING 500 ...
Page 87: ... 83 CABLE ROUTING SPEC ...
Page 89: ... 85 CABLE ROUTING SPEC ...
Page 91: ... 87 CABLE ROUTING SPEC ...
Page 93: ... 89 CABLE ROUTING SPEC ...
Page 95: ... 91 CABLE ROUTING SPEC ...
Page 97: ... 93 CABLE ROUTING SPEC CABLE ROUTING 600 700 ...
Page 99: ... 95 CABLE ROUTING SPEC ...
Page 101: ... 97 CABLE ROUTING SPEC ...
Page 103: ... 99 CABLE ROUTING SPEC ...
Page 105: ... 101 CABLE ROUTING SPEC ...
Page 107: ... 103 CABLE ROUTING SPEC ...
Page 109: ... 105 CABLE ROUTING SPEC ...
Page 112: ...WIRING DIAGRAM ...
Page 114: ...WIRING DIAGRAM ...