9
INSP
ADJ
POWER TRAIN
SHEAVE OFFSET ADJUSTMENT
1. Lift up the shroud.
2. Remove:
• Left side cover
Refer to “PRIMARY SHEAVE AND DRIVE V-
BELT” in CHAPTER 4.
3. Remove:
• Drive V-belt
4. Measure:
• Sheave offset
a
Use a straightedge that is approximately
470 mm (18.5 in) long, 20 mm (0.79 in) wide,
and 4 mm (0.16 in) thick.
Out of specification
→
Adjust.
NOTE:
Push the secondary sheave inward towards the
frame, and then measure the sheave offset.
Sheave offset:
13.5 ~ 16.5 mm (0.53 ~ 0.65 in)
5. Adjust:
• Sheave offset
Adjustment steps:
• Apply the brake to lock the secondary sheave.
• Remove the bolt (secondary sheave)
1
,
washer
2
and secondary sheave
3
.
• Adjust the sheave offset by adding or removing
shim(s)
4
.
Adding shim
→
Offset is increased.
Removing shim
→
Offset is decreased.
Shim size
Part number
Thickness
90201-252F1
0.5 mm (0.02 in)
90201-25527
1.0 mm (0.04 in)
90201-25289
1.6 mm (0.06 in)
90201-25526
2.0 mm (0.08 in)
Summary of Contents for VK10L
Page 10: ......
Page 84: ...32 INSP ADJ CARBURETOR TUNING Guide for carburetion ...
Page 111: ...INSP ADJ ...
Page 289: ...SPEC ...
Page 311: ...SPEC ...
Page 333: ...SPEC ...
Page 340: ...147 SPEC CABLE ROUTING A A A A 1 2 3 4 5 6 7 ...
Page 346: ...153 SPEC CABLE ROUTING 1 2 3 4 5 6 7 8 9 0 A B C D ...
Page 348: ...155 SPEC CABLE ROUTING B A A B A A E 8 9 9 0 0 A B C D 1 2 3 4 5 6 7 ...
Page 350: ...157 SPEC CABLE ROUTING A A 8 9 A 0 B 1 2 3 4 5 5 6 7 A A ...
Page 352: ...159 SPEC CABLE ROUTING A A 7 8 1 2 3 4 6 5 ...
Page 354: ...161 SPEC CABLE ROUTING 0 1 2 9 6 7 8 3 4 3 4 5 ...
Page 356: ......
Page 357: ......