4 - 6
ENG
ENGINE REMOVAL
EAS00192
INSTALLING THE ENGINE
1. Install:
• engine stay
1
• bolt (engine stay)
2
• down tube (right)
3
• bolt (down tube)
4
• bolt (rear)
5
• nut (front-upper)
6
• engine bracket
7
• bolt (engine bracket)
8
• bolt (front-lower)
9
NOTE:
@
Do not fully tighten the bolts.
@
T
R
.
.
16 Nm (1.6 m · kg)
T
R
.
.
45 Nm (4.5 m · kg)
T
R
.
.
70 Nm (7.0 m · kg)
T
R
.
.
42 Nm (4.2 m · kg)
T
R
.
.
16 Nm (1.6 m · kg)
T
R
.
.
42 Nm (4.2 m · kg)
2. Install:
• shift pedal link
1
NOTE:
@
• Align the punch mark
a
in the shift shaft with
the slot
b
in the shift pedal link.
• Align the bottom edge of the shift pedal with
the mark on the frame-to-swingarm bracket.
@
T
R
.
.
10 Nm (1.0 m · kg)
Summary of Contents for VMX12 2001
Page 1: ...VMX12 2001 3LRD AE1 SERVICEMANUAL ...
Page 2: ......
Page 8: ......
Page 9: ...GEN INFO 1 ...
Page 11: ...GEN INFO ...
Page 21: ......
Page 22: ...SPEC 2 ...
Page 24: ...SPEC ...
Page 52: ...2 28 SPEC OIL FLOW DIAGRAMS 1 Camshaft 2 Main gallery 3 Crankshaft 4 Oil level switch ...
Page 54: ...2 30 SPEC OIL FLOW DIAGRAMS 1 Crankshaft 2 Oil pipe 3 Oil filter ...
Page 65: ...CHK ADJ 3 ...
Page 125: ......
Page 126: ...ENG 4 ...
Page 130: ...ENG ...
Page 236: ......
Page 237: ...COOL 5 ...
Page 239: ...COOL ...
Page 258: ...CARB 6 ...
Page 260: ...CARB ...
Page 272: ......
Page 273: ...CHAS 7 ...
Page 389: ......
Page 390: ...ELEC 8 ...
Page 396: ...8 4 ELEC SWITCHES ...
Page 417: ...8 25 ELEC STARTER MOTOR 3 Install O rings 1 bolts 2 New T R 5 Nm 0 5 m kg ...
Page 445: ...TRBL SHTG 9 ...