POWR
TR
4-10
PRIMARY SHEAVE AND DRIVE V-BELT
INSTALLATION
1. Install:
•
Primary sheave assembly
CAUTION:
Be sure to remove any oil or grease from the
tapered portion of the crankshaft and spider us-
ing a cloth dampened with thinner.
2. Apply:
•
YAMALUBE 2-cycle oil or an equivalent grease
(to threads of primary sheave bolt)
3. Tighten:
•
Bolt (primary sheave)
1
Tightening steps:
•
Hold the primary sheave
3
using the primary
sheave holder
2
and tighten the bolt (primary
sheave) to specification.
Primary sheave holder:
90890-01701, YS-01880
Bolt (primary sheave):
(initial tightening)
120 Nm (12.0 m · kg, 85 ft · lb)
•
Loosen the bolt (primary shave) completely.
•
Retighten the bolt (primary sheave) to specifica-
tion.
Bolt (primary sheave):
60 Nm (6.0 m · kg, 43 ft · lb)
4. Adjust:
•
V-belt position
Refer to “DRIVE V-BELT” in CHAPTER 2.
•
Sheave distance
•
Sheave offset
•
Secondary sheave free play (clearance)
Refer to “SHEAVE DISTANCE AND OFFSET
ADJUSTMENT” in CHAPTER 2.
T
R
.
.
T
R
.
.
SEA4230
SEA4240
SEA4250
Summary of Contents for VX600ERG
Page 1: ...VX600ERG SX600G MM600G VT600G SERVICE MANUAL LIT 12618 02 20 8EA 28197 10 981059 ...
Page 57: ...2 43 INSP ADJ CARBURETORTUNING Guide for carburetion SEA2720 ...
Page 79: ...2 65 INSP ADJ REAR SUSPENSION ...
Page 220: ...8 21 ELEC CHARGING SYSTEM ...
Page 236: ...8 37 ELEC SIGNAL SYSTEM ...
Page 266: ...9 20 SPEC GENERAL TORQUE SPECIFICATIONS DEFINITION OF UNITS ...
Page 267: ...SPEC 9 21 CABLE ROUTING SEA9010 ...
Page 269: ...SPEC 9 23 CABLE ROUTING SEA9010 ...
Page 271: ...SPEC 9 25 CABLE ROUTING SEA9020 ...
Page 273: ...SPEC 9 27 CABLE ROUTING SEA9030 ...
Page 275: ...SPEC 9 29 CABLE ROUTING SEA9030 ...
Page 277: ...SPEC 9 31 CABLE ROUTING SEA9040 ...
Page 279: ...SPEC 9 33 CABLE ROUTING SEA9050 ...
Page 281: ...SPEC 9 35 CABLE ROUTING SEA9050 ...
Page 283: ...SPEC 9 37 CABLE ROUTING SEA9060 ...
Page 287: ...Printed in USA E CR PRINTED ON RECYCLED PAPER ...