POWR
TR
4-16
Adjustment steps:
•
Disassemble the secondary sheave.
•
Remove the bolts and original shims
1
.
•
Install new shims of the proper thickness and
reassemble the secondary sheave.
•
Measure the secondary sheave clearance again.
Repeat these steps until the clearance is within
specification.
NOTE:
Yamaha recommends keeping the original shims.
Shims:
Part number
Thickness
90201-061H1
0.5 mm (0.02 in)
90201-06037
1.0 mm (0.04 in)
SEA4380
INSTALLATION
1. Lubricate:
•
Splines (fixed sheave)
Recommended grease:
ESSO beacon 325 grease or
Aeroshell grease #7A
2. Tighten:
Bolt (secondary cheave):
64 Nm (6.4 m · kg, 46 ft · lb)
3. Adjust:
•
V-belt position
Refer to “DRIVE V-BELT” in CHAPTER 2.
•
Sheave distance
•
Sheave offset
•
Secondary sheave free play (clearance)
Refer to “SHEAVE DISTANCE AND OFFSET
ADJUSTMENT” in CHAPTER 2.
T
R
.
.
SECONDARY SHEAVE
Summary of Contents for VX600ERG
Page 1: ...VX600ERG SX600G MM600G VT600G SERVICE MANUAL LIT 12618 02 20 8EA 28197 10 981059 ...
Page 57: ...2 43 INSP ADJ CARBURETORTUNING Guide for carburetion SEA2720 ...
Page 79: ...2 65 INSP ADJ REAR SUSPENSION ...
Page 220: ...8 21 ELEC CHARGING SYSTEM ...
Page 236: ...8 37 ELEC SIGNAL SYSTEM ...
Page 266: ...9 20 SPEC GENERAL TORQUE SPECIFICATIONS DEFINITION OF UNITS ...
Page 267: ...SPEC 9 21 CABLE ROUTING SEA9010 ...
Page 269: ...SPEC 9 23 CABLE ROUTING SEA9010 ...
Page 271: ...SPEC 9 25 CABLE ROUTING SEA9020 ...
Page 273: ...SPEC 9 27 CABLE ROUTING SEA9030 ...
Page 275: ...SPEC 9 29 CABLE ROUTING SEA9030 ...
Page 277: ...SPEC 9 31 CABLE ROUTING SEA9040 ...
Page 279: ...SPEC 9 33 CABLE ROUTING SEA9050 ...
Page 281: ...SPEC 9 35 CABLE ROUTING SEA9050 ...
Page 283: ...SPEC 9 37 CABLE ROUTING SEA9060 ...
Page 287: ...Printed in USA E CR PRINTED ON RECYCLED PAPER ...