3-11
E
INSP
ADJ
POWER UNIT
2. Measure:
• YPVS cable slack
a
Out of specification
→
Adjust.
YPVS cable slack:
0.5–1.5 mm (0.02–0.06 in)
3. Adjust:
• YPVS cables 1 and 2
Adjustment steps:
• Loosen locknuts
1
and
2
.
• Turn adjusters
3
and
4
in until there is
slack in the cables.
• Align the hole
a
in the pulley with the
hole in the cylinder.
• Insert a 4 mm (0.16 in) diameter pin
through the pulley and cylinder holes.
• Turn adjusters
3
and
4
in or out until
the specified slack is obtained.
Turn in
Slack is increased.
Turn out
Slack is decreased.
• Finger tighten locknuts
1
and
2
.
• Remove the pin.
• Start the engine, and then turn it off.
• Check the alignment of the holes.
• If the holes are aligned correctly, tighten
the locknuts.
• If the holes are aligned incorrectly, repeat
the adjustment steps.
4
1
3
2
1
2
a
Summary of Contents for WaveRunner GP1300R
Page 1: ...SUPPLEMENTARY SERVICE MANUAL GP1300R WaveRunner F1G 28197 1G 1X LIT 18616 02 90 LIT186160290...
Page 10: ...E TROUBLE ANALYSIS TROUBLE ANALYSIS 48 SELF DIAGNOSIS 48 WIRING DIAGRAM...
Page 61: ...YAMAHA MOTOR CORPORATION USA Printed in USA Dec 2004 0 0 1 CR E...
Page 62: ...SERVICE MANUAL GP1300R WaveRunner F1G 28197 1F 11 LIT 18616 02 44 LIT186160244...
Page 340: ...YAMAHA MOTOR CORPORATION USA Printed in USA Feb 2003 0 0 1 CR E...