7-15
E
–
+
ELEC
IGNITION SYSTEM
2. Measure:
• Pickup coil output peak voltage
Below specification
→
Replace the
pickup coil.
Above specification
→
Replace the
ECM.
NOTE:
To crank the engine, connect the engine shut-
off cord (lanyard) to the engine shut-off switch,
and then press the start switch and engine
stop switch simultaneously.
3. Measure:
• Lighting coil output peak voltage
Below specification
→
Replace the light-
ing coil.
NOTE:
To crank the engine, connect the engine shut-
off cord (lanyard) to the engine shut-off switch,
and then press the start switch and engine
stop switch simultaneously.
Test harness (6 pins):
YB-06849
Test harness SM6195021-6
(6 pins):
90890-06849
Pickup coil output peak voltage:
White/red (W/R) – Black (B)
White/black (W/B) – Black (B)
White/yellow (W/Y) – Black (B)
r/min
Unloaded
Loaded
Cranking
2,000
3,500
V
6.0
6.0
24
40
Lighting coil tester (3 pins):
YB-06870
Test harness SMT250-3 (3 pins):
90890-06870
Lighting coil output peak voltage:
Green (G) – Green (G)
r/min
Unloaded
Loaded
Cranking
2,000
3,500
V
9.0
7.5
12.5
12.5
Summary of Contents for WaveRunner GP1300R
Page 1: ...SUPPLEMENTARY SERVICE MANUAL GP1300R WaveRunner F1G 28197 1G 1X LIT 18616 02 90 LIT186160290...
Page 10: ...E TROUBLE ANALYSIS TROUBLE ANALYSIS 48 SELF DIAGNOSIS 48 WIRING DIAGRAM...
Page 61: ...YAMAHA MOTOR CORPORATION USA Printed in USA Dec 2004 0 0 1 CR E...
Page 62: ...SERVICE MANUAL GP1300R WaveRunner F1G 28197 1F 11 LIT 18616 02 44 LIT186160244...
Page 340: ...YAMAHA MOTOR CORPORATION USA Printed in USA Feb 2003 0 0 1 CR E...