For Service Engineers
Service Information
SI1906002E-001=YSP10 installation and adjustment procedures
24/120
6. Install accessories packaged with the machine
6.1. Install the signal tower
The signal tower is detached connector and packaged separately, or being over sideways on the top
surface of machine and fixed with masking tape. Connect the sockets and fix to the machine using a
hexagon wrench to tighten the mounting bolts.
After installing the signal tower, check the signal tower cables from inside the machine and arrange
cables if necessary.
6.2. Install the operation monitor on the machine
Set screws on the monitor rear side.
Set 4 screws packaged with the machine on the monitor rear side. Do not screw in the screws
completely but leave the clearance approximately 5mm.
Leave some
clearance.
Mounting bolts
Connector