Connect the cable to the CE transformer’s terminal block (left).
Connect the cables which connects to the air conditioning unit to the CE
transformer’s terminal block (right).
(Below the left-side breaker) Connect the
power cable from
the mains
to the terminal
block’s lower row.
(Below the right-side breaker) Connect
the air conditioning unit
’s power
cable to the terminal block’s lower row.
Lead cables from mains toward
inside CE transformer through
those holes.