GENERATOR AND STARTER CLUTCH
5-67
EASB291284
INSTALLING THE STARTER CLUTCH
1. Install:
• Stator “1”
• Stator bolt “2”
• Crankshaft position sensor “3”
• Holder “4”
• Crankshaft position sensor bolt “5”
TIP
• Pass the AC magneto lead “6” and crankshaft
position sensor lead “7” under the holder as
shown.
• Tighten the stator bolt using the T25 bit.
• Apply the sealant to the grommet of the AC
magneto lead.
2. Install
• Starter clutch drive gear “1”
TIP
Apply the engine oil on the starter clutch drive
gear inner circumference.
3. Install:
• Starter clutch “1”
To generator rotor “2”.
EASB291285
INSTALLING THE GENERATOR
1. Install:
• Woodruff key “1”
• Generator rotor “2”
TIP
• Clean the contact surfaces of the tapered por-
tions of the crankshaft and generator rotor.
• When installing the woodruff key, make sure
that its flat surface “a” is in parallel with the
crankshaft center line “b”.
• When installing the generator rotor, align the
keyway “c” of the generator rotor with the
woodruff key.
Stator bolt
7 Nm (0.7 m·kgf, 5.1 ft·lbf)
LOCTITE®
Crankshaft position sensor bolt
10 Nm (1.0 m·kgf, 7.2 ft·lbf)
Yamaha bond No. 1215
90890-85505
(Three bond No.1215®)
T
R
.
.
T
R
.
.
6
7
1
3
2
2
5
5
4
LT
Starter clutch bolt
16 Nm (1.6 m·kgf, 12 ft·lbf)
LOCTITE®
2
1
LT
T
R
.
.
Summary of Contents for YZ 2015 Series
Page 6: ...EASB291006 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 10: ......
Page 33: ...CONTROL FUNCTIONS 1 21 a 2...
Page 65: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 22 EASB291066...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 72: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29...
Page 74: ...CABLE ROUTING DIAGRAM 2 31 EASB291068 CABLE ROUTING DIAGRAM...
Page 76: ...CABLE ROUTING DIAGRAM 2 33...
Page 78: ...CABLE ROUTING DIAGRAM 2 35...
Page 80: ...CABLE ROUTING DIAGRAM 2 37...
Page 82: ...CABLE ROUTING DIAGRAM 2 39...
Page 84: ...CABLE ROUTING DIAGRAM 2 41...
Page 86: ...CABLE ROUTING DIAGRAM 2 43...
Page 88: ...CABLE ROUTING DIAGRAM 2 45...
Page 128: ...ELECTRICAL SYSTEM 3 38...
Page 200: ...CHAIN DRIVE 4 70...
Page 244: ...ELECTRIC STARTER 5 41...
Page 266: ...OIL PUMP AND BALANCER GEAR 5 63 c d 6 6 7 8 8 b...
Page 286: ...TRANSMISSION 5 83...
Page 306: ...CHECKING THE INTAKE AIR TEMPERATURE SENSOR 8 67 CHECKING THE FUEL INJECTOR 8 68...
Page 321: ...CHARGING SYSTEM 8 15 EASB291338...
Page 325: ...COOLING SYSTEM For JPN 8 19 EASB291341...
Page 355: ...FUEL PUMP SYSTEM 8 49 EASB291348...
Page 356: ...ELECTRICAL COMPONENTS 8 50 ELECTRICAL COMPONENTS EASB291349 8 9 10 1 3 2 4 5 6 7...
Page 358: ...ELECTRICAL COMPONENTS 8 52 11 10 9 2 3 1 6 7 8 4 5...
Page 360: ...ELECTRICAL COMPONENTS 8 54 EASB291350 CHECKING THE SWITCHES 4 1 3 2 E B S E B E B E E B B...
Page 382: ...LIST OF SELF DIAGNOSTIC AND FAIL SAFE ACTIONS 9 7...