ENGINE REMOVAL
5-9
3. Bend the lock washer tab to lock the nut.
4. Install:
•
Drive sprocket guide
•
Drive sprocket cover “1”
•
Bolt (drive sprocket cover) “2”
EAM30167
INSTALLING THE EXHAUST PIPE AND
MUFFLER
1. Install:
•
Gasket
•
Exhaust pipe 1 “1”
•
Nut (exhaust pipe 1) “2”
TIP
First temporarily tighten all nuts to 13 N·m (1.3
kgf·m, 9.6 lb·ft). Then retighten them to 20 N·m
(2.0 kgf·m, 15 lb·ft).
2. Install:
•
Clamp
•
Exhaust pipe 2 “1”
•
Bolt (exhaust pipe 2) “2”
TIP
Install and temporarily tighten the exhaust pipe 2
with its end positioned as shown with respect to
the exhaust pipe 1.
3. Install:
•
Clamp
•
Silencer “1”
•
Bolt (silencer) “2”
TIP
Install and temporarily tighten the silencer so
that its joint is positioned as shown with respect
to the exhaust pipe 2.
Bolt (drive sprocket cover)
7 N·m (0.7 kgf·m, 5.2 lb·ft)
Nut (exhaust pipe)
20 N·m (2.0 kgf·m, 15 lb·ft)
T
R
.
.
2
1
New
T
R
.
.
1
2
2
Bolt (silencer)
30 N·m (3.0 kgf·m, 22 lb·ft)
1
2
2mm (0.08in)
T
R
.
.
2
2
1
Summary of Contents for YZ 2019 Series
Page 6: ...EAM20162 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 10: ......
Page 40: ...MOTORCYCLE CARE AND STORAGE 1 28...
Page 63: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 22...
Page 66: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29...
Page 72: ...CABLE ROUTING DIAGRAM 2 31 EAM20152 CABLE ROUTING DIAGRAM...
Page 74: ...CABLE ROUTING DIAGRAM 2 33...
Page 76: ...CABLE ROUTING DIAGRAM 2 35...
Page 78: ...CABLE ROUTING DIAGRAM 2 37...
Page 80: ...CABLE ROUTING DIAGRAM 2 39...
Page 82: ...CABLE ROUTING DIAGRAM 2 41...
Page 84: ...CABLE ROUTING DIAGRAM 2 43...
Page 86: ...CABLE ROUTING DIAGRAM 2 45...
Page 126: ...ELECTRICAL SYSTEM 3 38...
Page 177: ...FRONT FORK 4 49 1...
Page 196: ...CHAIN DRIVE 4 68...
Page 217: ...CAMSHAFT 5 18 Spark plug Spark plug 13 N m 1 3 kgf m 9 6 lb ft T R...
Page 237: ...ELECTRIC STARTER 5 38...
Page 256: ...OIL PUMP AND BALANCER GEAR 5 57 a 2 10 b 2 9 1 b 5 3 a 4 10 5 9 3 E c d 6 7 8 8 b 6...
Page 262: ...GENERATOR AND STARTER CLUTCH 5 63 1 a 3 3 2 4...
Page 276: ...TRANSMISSION 5 77...
Page 284: ...WATER PUMP 6 7...
Page 290: ...FUEL TANK 7 5 A Left B Right 1 1 A 0 mm 0 in B 1 1 15 mm 0 59 in...
Page 296: ...THROTTLE BODY 7 11...
Page 299: ......
Page 313: ...CHARGING SYSTEM 8 14...
Page 343: ...FUEL INJECTION SYSTEM 8 44...
Page 347: ...FUEL PUMP SYSTEM 8 48...
Page 348: ...ELECTRICAL COMPONENTS 8 49 EAM20147 ELECTRICAL COMPONENTS 9 10 1 3 2 4 5 6 7 8...
Page 350: ...ELECTRICAL COMPONENTS 8 51 11 10 9 2 3 1 6 7 8 4 5...
Page 352: ...ELECTRICAL COMPONENTS 8 53 EAM30289 CHECKING THE SWITCHES 4 1 3 2 B B Sb B B B B B B B B...
Page 368: ...ELECTRICAL COMPONENTS 8 69...
Page 376: ...LIST OF SELF DIAGNOSTIC AND FAIL SAFE ACTIONS 9 7...