TRANSMISSION
5-74
sembly.
EAM30156
CHECKING THE TRANSMISSION
1. Measure:
•
Main axle runout
(with a centering device and dial gauge “1”)
Out of specification
Replace the main axle.
2. Measure:
•
Drive axle runout
(with a centering device and dial gauge “1”)
Out of specification
Replace the drive axle.
3. Check:
•
Transmission gears
Blue discoloration/pitting/wear
Replace
the defective gear(s).
•
Transmission gear dogs
Cracks/damage/rounded edges
Replace
the defective gear(s).
4. Check:
•
Transmission gear movement
Rough movement
Replace the defective
gear(s).
EAM30157
INSTALLING THE TRANSMISSION
1. Install:
•
6th pinion gear (27T) “1”
•
3rd/4th pinion gear (18T/21T) “2”
•
Collar “3”
•
5th pinion gear (23T) “4”
•
2nd pinion gear (16T) “5”
(to the main axle “6”)
TIP
Before installation, apply molybdenum disulfide
oil to the inner and end surface of the idler gear
and to the inner surface of the sliding gear, then
install.
2. Install:
•
2nd wheel gear (29T) “1”
•
5th wheel gear (22T) “2”
•
3rd wheel gear (26T) “3”
•
4th wheel gear (24T) “4”
•
6th wheel gear (22T) “5”
•
Collar “6”
•
1st wheel gear (31T) “7”
•
O-ring “8”
(to the drive axle “9”)
TIP
•
Before installation, apply molybdenum disul-
fide oil to the inner and end surface of the idler
gear and the collar and to the inner surface of
the sliding gear, then install.
•
Apply the lithium-soap-based grease on the O-
ring.
Main axle runout limit
0.08 mm (0.0032 in)
Drive axle runout limit
0.08 mm (0.0032 in)
3
4
2
1
6
5
M
New
Summary of Contents for YZ 2019 Series
Page 6: ...EAM20162 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 10: ......
Page 40: ...MOTORCYCLE CARE AND STORAGE 1 28...
Page 63: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 22...
Page 66: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29...
Page 72: ...CABLE ROUTING DIAGRAM 2 31 EAM20152 CABLE ROUTING DIAGRAM...
Page 74: ...CABLE ROUTING DIAGRAM 2 33...
Page 76: ...CABLE ROUTING DIAGRAM 2 35...
Page 78: ...CABLE ROUTING DIAGRAM 2 37...
Page 80: ...CABLE ROUTING DIAGRAM 2 39...
Page 82: ...CABLE ROUTING DIAGRAM 2 41...
Page 84: ...CABLE ROUTING DIAGRAM 2 43...
Page 86: ...CABLE ROUTING DIAGRAM 2 45...
Page 126: ...ELECTRICAL SYSTEM 3 38...
Page 177: ...FRONT FORK 4 49 1...
Page 196: ...CHAIN DRIVE 4 68...
Page 217: ...CAMSHAFT 5 18 Spark plug Spark plug 13 N m 1 3 kgf m 9 6 lb ft T R...
Page 237: ...ELECTRIC STARTER 5 38...
Page 256: ...OIL PUMP AND BALANCER GEAR 5 57 a 2 10 b 2 9 1 b 5 3 a 4 10 5 9 3 E c d 6 7 8 8 b 6...
Page 262: ...GENERATOR AND STARTER CLUTCH 5 63 1 a 3 3 2 4...
Page 276: ...TRANSMISSION 5 77...
Page 284: ...WATER PUMP 6 7...
Page 290: ...FUEL TANK 7 5 A Left B Right 1 1 A 0 mm 0 in B 1 1 15 mm 0 59 in...
Page 296: ...THROTTLE BODY 7 11...
Page 299: ......
Page 313: ...CHARGING SYSTEM 8 14...
Page 343: ...FUEL INJECTION SYSTEM 8 44...
Page 347: ...FUEL PUMP SYSTEM 8 48...
Page 348: ...ELECTRICAL COMPONENTS 8 49 EAM20147 ELECTRICAL COMPONENTS 9 10 1 3 2 4 5 6 7 8...
Page 350: ...ELECTRICAL COMPONENTS 8 51 11 10 9 2 3 1 6 7 8 4 5...
Page 352: ...ELECTRICAL COMPONENTS 8 53 EAM30289 CHECKING THE SWITCHES 4 1 3 2 B B Sb B B B B B B B B...
Page 368: ...ELECTRICAL COMPONENTS 8 69...
Page 376: ...LIST OF SELF DIAGNOSTIC AND FAIL SAFE ACTIONS 9 7...