5-1
CHAS
FRONT WHEEL AND REAR WHEEL
Extent of removal
Order
Part name
Q’ty
Remarks
FRONT WHEEL REMOVAL
Preparation for
Hold the machine by placing the
removal
suitable stand under the engine.
1
Hose cover
1
2
Bolt (brake hose holder)
2
Only loosening.
3
Bolt (axle holder)
4
Only loosening.
4
Nut (front wheel axle)
1
5
Front wheel axle
1
6
Front wheel
1
7
Collar
2
8
Oil seal
2
9
Bearing
2
Refer to “REMOVAL POINTS”.
10
Brake disk
1
EC500000
CHASSIS
EC590000
FRONT WHEEL AND REAR WHEEL
EC598000
FRONT WHEEL
2
1
3
3
Extent of removal:
1
Front wheel removal
2
Wheel bearing removal
3
Brake disc removal
w
Support the machine securely so there is no dan-
ger of it falling over.
5
23 Nm (2.3 m•kg, 17 ft•lb)
23 Nm (2.3 m•kg, 17 ft•lb)
105 Nm (10.5 m•kg, 75 ft•lb)
16 Nm (1.6 m•kg, 11 ft•lb)
7 Nm (0.7 m•kg, 5.1 ft•lb)
12 Nm (1.2 m•kg, 8.7 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
5NY-9-30-5A 5/23/01 9:00 PM Page 2
Summary of Contents for YZ125(P)/LC
Page 128: ...3 3 INSP ADJ MEMO...
Page 286: ...4 37 ENG CLUTCH AND PRIMARY DRIVEN GEAR 4 Install 9Plain washer 1 9Circlip 2...
Page 562: ...TUN MEMO...
Page 563: ......