5-40
CHAS
HANDLEBAR
Extent of removal
Order
Part name
Q’ty
Remarks
Preparation for
HANDLEBAR REMOVAL
removal
Number plate
Remove the clamp portion only.
1
Clutch cable
1
Disconnect at the lever side.
2
Clutch lever holder
1
3
“ENGINE STOP” button
1
4
Master cylinder
1
Refer to “REMOVAL POINTS”.
5
Throttle cable cap
1
Turn over the cap cover.
6
Throttle cable
1
Disconnect at the throttle side.
7
Throttle
1
Loosen the bolts.
8
Cap cover
1
9
Collar
1
10
Grip (left)
1
Refer to “REMOVAL POINTS”.
11
Handlebar holder (upper)
2
12
Handlebar
1
EC5B0000
HANDLEBAR
1
Extent of removal:
1
Handlebar removal
1 Nm (0.1 m•kg, 0.7 ft•lb)
4 Nm (0.4 m•kg, 2.9 ft•lb)
9 Nm (0.9 m•kg, 6.5 ft•lb)
28 Nm (2.8 m•kg, 20 ft•lb)
4 Nm (0.4 m•kg, 2.9 ft•lb)
2 Nm (0.2 m•kg, 1.4 ft•lb)
5NY-9-30-5C 5/23/01 9:09 PM Page 2
Summary of Contents for YZ125(P)/LC
Page 128: ...3 3 INSP ADJ MEMO...
Page 286: ...4 37 ENG CLUTCH AND PRIMARY DRIVEN GEAR 4 Install 9Plain washer 1 9Circlip 2...
Page 562: ...TUN MEMO...
Page 563: ......