2-13
CABLE ROUTING DIAGRAM
D.
Install the ignition coil, side core
and ground lead together to the
frame. Take care to fasten the
ground lead so that its terminal
is within the indicated range.
E.
Clamp the throttle cable and
high tension cord to the frame.
F.
Clamp the clutch cable to the left
engine bracket. Clamp the
clutch cable below the position-
ing grommet.
G. Pass the air vent hose back of
the throttle cable.
H.
Pass the air vent hose, overflow
hose and crankcase breather
hose between the frame and
connecting rod.
I.
Pass the radiator breather hose
and YPVS breather hose out-
side the engine bracket and in-
side the down tube. Then pass
the radiator breather hose inside
the YPVS breather hose.
J.
Clamp the CDI magneto lead,
radiator breather hose and
YPVS breather hose to the
frame.
K.
Clamp to the frame the CDI
magneto lead and radiator
breather hose. Take care to
clamp them above the projection
on the frame.
L.
Locate the clamp ends in the ar-
rowed range.
M. Pass the air vent hose, overflow
hose and crankcase breather
hose so that they do not contact
the rear shock absorber.
N.
Bring the connector cover into
contact with the coupler.
Summary of Contents for YZ125X1
Page 2: ...1C3 9 33_cover 07 6 14 9 59 AM Page 2...
Page 3: ...YZ125 X X1 1C3 28199 33 E0 2008 OWNER S SERVICE MANUAL...
Page 4: ......
Page 87: ...4 32 WATER PUMP...
Page 131: ...5 30 STEERING 9 Bearing race 2 Refer to removal section Order Part name Q ty Remarks...
Page 159: ......