2-14
CABLE ROUTING DIAGRAM
1.
High tension cord
2.
"ENGINE STOP" button lead
3.
Ignition coil lead
4.
Clamp
5.
CDI unit
6.
CDI unit band
7.
Radiator breather hose
8.
CDI magneto lead
9.
Connector cover
10. Throttle cable
11. Clutch cable
12. CDI unit stay
A.
Pass the high tension cord to the
left of the radiator hose.
B.
Using a plastic locking tie, clamp
the "ENGINE STOP" button
lead, ignition coil lead and CDI
magneto lead together with the
clamp ends backward and then
cut off the tie end.
C.
Clamp to the frame the throttle
cable, clutch cable, ignition coil
lead and "ENGINE STOP" but-
ton lead. In so doing, clamp the
ignition coil lead and "ENGINE
STOP" button lead at their pro-
tecting tubes. Tighten the clamp
so that the "ENGINE STOP" but-
ton lead is not pulled when the
handlebar is turned to the right
and left.
Summary of Contents for YZ125X1
Page 2: ...1C3 9 33_cover 07 6 14 9 59 AM Page 2...
Page 3: ...YZ125 X X1 1C3 28199 33 E0 2008 OWNER S SERVICE MANUAL...
Page 4: ......
Page 87: ...4 32 WATER PUMP...
Page 131: ...5 30 STEERING 9 Bearing race 2 Refer to removal section Order Part name Q ty Remarks...
Page 159: ......