EC083000
MANUAL FORMAT
All of the procedures in this manual are organized in a sequential, step-by-step format. The information
has been complied to provide the mechanic with an easy to read, handy reference that contains com-
prehensive explanations of all disassembly, repair, assembly, and inspection operations.
In this revised format, the condition of a faulty component will precede an arrow symbol and the course
of action required will follow the symbol, e.g.,
9
Bearings
Pitting/Damage
→
Replace.
EC084002
HOW TO READ DESCRIPTIONS
To help identify parts and clarify procedure steps, there are exploded diagrams at the start of each
removal and disassembly section.
1. An easy-to-see exploded diagram
1
is provided for removal and disassembly jobs.
2. Numbers
2
are given in the order of the jobs in the exploded diagram. A number that is enclosed
by a circle indicates a disassembly step.
3. An explanation of jobs and notes is presented in an easy-to-read way by the use of symbol marks
3
. The meanings of the symbol marks are given on the next page.
4. A job instruction chart
4
accompanies the exploded diagram, providing the order of jobs, names
of parts, notes in jobs, etc.
5. Extent of removal
5
is provided in the job instruction chart to save the trouble of an unnecessary
removal job.
6. For jobs requiring more information, the step-by-step format supplements
6
are given in addition
to the exploded diagram and job instruction chart.
4-33
CLUTCH AND PRIMARY DRIVEN GEAR
ENG
Extent of removal
Order
Part name
Q’ty
Remarks
PRIMARY DRIVEN GEAR, PUSH
ROD AND PUSH LEVER AXLE
REMOVAL
1
Push rod 1
1
2
Circlip
1
3
Plain washer
1
4
Bearing
1
5
Push rod 2
1
6
Nut (clutch boss)
1
Use special tool.
7
Lock washer
1
Refer to “REMOVAL POINTS”.
8
Clutch boss
1
9
Thrust plate [D=ø44mm (1.73 in)]
1
10
Primary driven gear
1
11
Bearing
1
12
Thrust plate [D=ø42mm (1.65 in)]
1
13
Bolt (push lever axle)
1
14
Push lever axle
1
EC498200
PRIMARY DRIVEN GEAR, PUSH ROD AND PUSH LEVER AXLE
Extent of removal:
1
Push rod and push lever axle removal
2
Push rod 1 disassembly
3
Primary driven gear removal
2
3
1
1
1
3
75 Nm (7.5 m•kg, 54 ft•lb)
6 Nm (0.6 m•kg, 4.3 ft•lb)
4-34
CLUTCH AND PRIMARY DRIVEN GEAR
ENG
EC493000
REMOVAL POINTS
EC483211
Clutch boss
1. Remove:
9
Nut
1
9
Lock washer
2
9
Clutch boss
3
NOTE:
Straighten the lock washer tab and use the
clutch holding tool
4
,
5
to hold the clutch boss.
å
For USA and CDN
∫
Except for USA and CDN
EC494000
INSPECTION
EC484100
Clutch housing and boss
1. Inspect:
9
Clutch housing
1
Cracks/Wear/Damage
→
Replace.
9
Clutch boss
2
Scoring/Wear/Damage
→
Replace.
EC484201
Primary driven gear
1. Check:
9
Circumferential play
Free play exists
→
Replace.
9
Gear teeth
a
Wear/ Damage
→
Replace.
EC484400
Clutch spring
1. Measure:
9
Clutch spring free length
a
Out of specification
→
Replace springs as
a set.
Clutch holding tool:
YM-91042................................
4
4
90890-04086............................
5
5
Clutch spring free length:
Standard
<Limit>
44.0 mm
42.0 mm
(1.732 in)
(1.654 in)
å
∫
å
1
2
3
4
5
6
5MW-9-30-0 7/5/00 2:14 PM Page 12