4-43
KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE GEAR
ENG
3. Install:
9
Shift lever assembly
1
9
Shift guide
2
NOTE:
9
The shift lever assembly is installed at the
same time as the shift guide.
9
Apply the transmission oil on the bolt (segment)
shaft.
2. Install:
9
Shift lever assembly
1
To shift guide
2
.
EC4C5202
Shift guide and shift lever assembly
1. Install:
9
Spring
1
9
Pawl pin
2
9
Pawl
3
To shift lever
4
.
EC4C5000
ASSEMBLY AND INSTALLATION
EC4C5130
Stopper lever
1. Install:
9
Tension spring
1
9
Holder
2
9
Bolt (holder)
3
9
Plain washer
4
9
Stopper lever
5
9
Bolt (stopper lever)
6
NOTE:
Align the stopper lever roller with the slot on seg-
ment.
10 Nm (1.0 m•kg, 7.2 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
5MW-9-30-4B 7/3/00 7:08 PM Page 34