2 - 20
SPEC
1
CDI unit
2
Hot starter cable
3
Throttle cable (pull)
4
Throttle cable (return)
5
Cable guide
6
Ignition coil
7
Radiator hose 2
8
Radiator breather hose
9
Radiator hose 4
0
CDI unit bracket
A
CDI unit band
È
Pass the hot starter cable and
throttle cables through the
cable guides.
É
Pass the hot starter cable and
throttle cables between the
radiator and frame, then over
the radiator mounting boss.
Ê
Pass the throttle cables on the
outside of the ignition coil.
Ë
Pass the radiator breather
hose in front of the radiator
hose 2, on the left of the chas-
sis, and then between the
frame and radiator hose 4.
Ì
Insert the CDI unit band over
the CDI unit bracket as far as
possible.
Í
First install the CDI unit and
CDI unit band to the CDI unit
bracket, then the CDI unit
bracket to the frame.
A
1
0
Í
Ì
B
7
8
9
Ë
A
2 3
4
5
È
1
É
Ê
6
A
B
CABLE ROUTING DIAGRAM