2-35
CABLE ROUTING
SPEC
G Clamp the head light lead by
wrapping and insert it to the in-
take air grill hole. (only at the
right side.)
H Do not connect the wire to the
coupler with the plug for options.
I To the turn signal light
J To the wire harness
K Cut the tip of the clamp.
A Insert to the rib of the head light.
(Either location of the right and
left relays is acceptable.)
B The lead should not stretch too
much.
C Make sure to insert the coupler
and boot to the stay 1 hole.
D The speedometer lead should
not be strained.
E To the stay 1 hole
F Connect after passing over the
upper side of the duct.
1
Ground lead
2
Meter lead
3
Stay 1
4
Auxiliary light lead (right)
5
Headlight lead
6
Auxiliary light lead (left)
7
Console panel 1
8
Duct 1
9
Console panel 2
10
Duct 2
11
Headlight lead (right)
12
Headlight lead (left)
EAS00035
CABLE ROUTING
28
Summary of Contents for YZF-R1 2004
Page 1: ...Yamaha Motor Co Ltd 2004 YZF R1 S 5VY1 SE1 SERVICE INFORMATION ...
Page 50: ...YZF R1 S 2004 WIRING DIAGRAM ...
Page 51: ......