12
2. Before Use
Installation method
* For a knock-down product (that can be customized) of a standard or air curtain type, our
workers carry out assembly and installation totally.
Installation procedure for standard, air curtain, and low-ceiling types
This product consists of the hood and frame. Install as shown below:
①
At first, put the frame in position. If it is unpractical to put the hood on the frame in the position,
put the hood on the frame in the forward position, and then move them in position.
②
Next, remove two blocks which are attached to the lower part of both side plates. (The blocks
are secured with four M8 bolts from the bottom.)
③
Then, lift the hood and place on the frame.
C a u ti o n
The hood must be lifted with at least 5 persons.
The mood must be lifted with every location of hood elevated evenly, or
interior material may be cracked.
④
Install the hood to the frame and secure with the bolts attached. (See fig. 2-1) At this time,
measure the outside dimension between front columns of hood and adjust the dimension to
that shown in “10. Specifications (P. 411” (If the dimensions differ, rattling of door or faulty
operation may be caused).
Fig. 2-1
Hood
Frame
Secure with bolts attached
(4 places)