14
3. PRE-OPERATION PROCEDURES
Installation Precautions
Always connect power cable to appropriate facility outlet or terminal.
Connect power cable to a suitable facility outlet or terminal, according to the electrical
requirements.
Electrical
requirements:
115V AC 7.5 A (ELCB capacity: 10 A)
Standard test conditions with no load should be as follows. Operational voltage range:
±10%, Voltage range at which specified performance is guaranteed: ±10%, Frequency
rating:
±
1%.
*Check the line voltage on distribution board and properly evaluate whether to utilize a
line being shared by other equipment. If unit is not activated by turning on ELCB, take an
appropriate course of action, such as connecting unit to a dedicated power source.
Connecting multiple cables using a branch outlet or extension cord will cause voltage to
drop, leading to degraded temperature control or malfunction.
Power cable, terminal processing
Standard
Cable end processing
3-core 2.0 mm2 (*1)
With a plug
* The length of power cable is about 2 m. *1 Nominal cross-sectional area of conductor
Install equipment in a well-ventilated place
Do not operate unit with ventilating openings on unit (front, side, rear) obstructed.
Doing so may result in excessive temperatures inside the unit control panel, causing
possible degraded CPU board performance, malfunction or fire.
Install in a dry location.
Install unit where it will be free from
liquid spray and other moisture.
Failure to do so may result in
control mechanisms becoming wet,
causing malfunction, electric shock
and/or fire.
Summary of Contents for Neocool CF302L-A
Page 2: ......
Page 5: ...1 1 SAFETY PRECAUTIONS Explanation of Symbols ...