15
Installation
Initial Set Up
Filter Installation
Be sure to install the filter prior to operation.
Install the bottom plate
The bottom plate balances the material in the
chamber and protects heater 1 and sensor 2. Be
sure to install the plate.
Close the drain valve
Be sure to close the drain valve.
Bottom Plate
(at a level)
OPEN
CLOSE