1.
Connect each section of the pole by screw as below,
2.
To connect the steel wire after connecting the tower as below picture.
For safety, you could twine the tower with the steel wire for a circle
before fixing the wire with the fixture. There need to be two fixtures
for each steel wire, and 10-20 cm need to be left in the end of the
wire.
3.
Besides aiming the steel wire for front basement, the ends of all
other steel wire need to connect with the corresponding basement. And
you could fix all wires after the installation of the tower as below: