7.
【
3KW and above 3KW
】
Please installing the bolts to the three hole at
the bottom of the tower after the erecting of the tower.
8.
To check the length of 4 pieces of steel wire, and fix it with fixture.
Note, please leave a proper radian for the steel wire.
9.
【
3KW and above3KW
】
You need to take the subsidiary pole away and
release the steel wire after installation.
5.4 Lay down the tower
For laying down the tower, a no wind weather is needed, as well as a
yoke, which is the same when for installing.
Break the connection to stop the generator, which could be checked in
the user’s manual.
【
If using a crane
】
The harness should be tied to the generator by
professional people. And then ,release the screw and steel wire to lay