BEFORE YOU OPERATE
2V Operation Manual
41
DAILY CHECKS
Before you begin any job, make sure the Yanmar
2V engine is in good operating condition. Make
sure you check the following items before you start
your shift and have any repairs completed before
you start work.
Visual Checks
1. Check for engine oil leaks.
2. Check for fuel leaks.
3. Check for engine coolant leaks.
4. Check for damaged or missing parts.
5. Check for loose, missing, or damaged
fasteners.
6. Check the electrical harnesses for cracks,
abrasions, and damaged or corroded
connectors.
7. Check hoses for cracks, abrasions, and
damaged, loose or corroded clamps.
8. Check and clean radiator fins as necessary.
See Check and Clean Radiator Fins on
page 77
9. Check the fuel filter for the presence of water
and contaminants. If you find any water or
contaminants, drain the fuel tank and replace
the fuel filter
.
Check Diesel Fuel, Engine Oil, and
Engine Coolant Levels
Follow the procedures in
Engine Oil on page 36
and
o
n
page 38
to check these levels.
A
WARNING
HIGH-PRESSURE HAZARD!
• Avoid skin contact with the
high-pressure diesel fuel spray caused
by a fuel system leak such as a broken
fuel injection line. High-pressure fuel
can penetrate your skin and result in
serious injury. If you are exposed to
high-pressure fuel spray, obtain
prompt medical treatment.
• NEVER check for a fuel leak with your
hands. ALWAYS use a piece of wood
or cardboard. Have your authorized
Yanmar industrial engine dealer or
distributor repair the damage.
• Failure to comply could result in death
or serious injury.
0000008en
CAUTION
If any problem is noted during the visual
check, the necessary corrective action
should be taken before you operate the
engine.
0000021en
Summary of Contents for 0A2V000-U0000
Page 1: ...2V series OPERATION MANUAL 2V Operation Manual P N 0A2V000 U0000 INDUSTRIAL ENGINES 2V750 V ...
Page 12: ...YANMAR WARRANTIES xii 2V Operation Manual This Page Intentionally Left Blank ...
Page 16: ...TABLE OF CONTENTS xvi 2V Operation Manual This Page Intentionally Left Blank ...
Page 42: ...PRODUCT OVERVIEW 26 2V Operation Manual This Page Intentionally Left Blank ...
Page 100: ...PERIODIC MAINTENANCE 84 2V Operation Manual This Page Intentionally Left Blank ...
Page 108: ...LONG TERM STORAGE 92 2V Operation Manual This Page Intentionally Left Blank ...
Page 112: ...SPECIFICATIONS 96 2V Operation Manual This Page Intentionally Left Blank ...