PERIODIC MAINTENANCE
112
JH Series Operation Manual
Inspection and Maintenance
See Inspection and Maintenance of Emission-Related Parts on page 115
for the EPA
emission-related parts. Inspection and maintenance procedures not shown in
and Maintenance of Emission-Related Parts on page 115
are covered in
MAINTENANCE SCHEDULE on page 113
This maintenance must be performed to keep the emission values of your engine in the
standard values during the warranty period. The warranty period is determined by the age
of the engine or the number of hours of operation.
Installation of Exhaust Sampling Port
All engines subject to emission standards shall be equipped with a connection in the
engine exhaust system that is located downstream of the engine, and before any point at
which the exhaust contacts water (or any other cooling / scrubbing medium), for the
temporary attachment of gaseous and/or particulate emissions sampling equipment.
This connection shall be internally threaded with standard pipe threads of a size not larger
than 12.7 mm (0.5 in.), and shall be closed by a pipe plug when not in use.
Equivalent connections are allowed.
The instructions for the proper installation and location of the required sample port, in
addition to those specified above in the quoted federal regulation, are follows:
1. The connection should be located as far downstream as reasonably practicable from
any sharp bend (of 30 degrees or more) in the exhaust pipe to help ensure that a
well-mixed exhaust flow sample may be taken;
2. The requirement that the connection be located before any point at which the exhaust
contacts water (or any other cooling / scrubbing medium) does not include contact with
water used to cool exhaust manifolds, unless the water is allowed to come into direct
contact with the exhaust gases;
3. To allow ready access to the sample port, the connection should be located, if possible
given the constraints of vessel design, approximately 0.6 to 1.8 m (2 to 6 ft) above a
deck or walkway;
4. To facilitate insertion and withdrawal of an exhaust sample probe, there should be no
obstructions for at least one and one-half exhaust pipe / stack diameters perpendicular,
i.e., 90 degrees, from the sample port; and
5. If a threaded connection is used, both the internal and external threads should be
coated with a high-temperature, anti-seize compound before the initial installation and
at every subsequent re-installation to facilitate removal of the connection for testing.
3JH40_4JH45_4JH57_4JH80_4JH110_EN_OPM.book 112 ページ 2022年9月22日 木曜日 午後6時17分