![background image](http://html.mh-extra.com/html/yanmar/neotower/neotower_operation-manual_905664021.webp)
RMB/ENERGIE GmbH | 21
assembly
Operation manual CHP 5.0 - 30.0 | Status 01.2020
D
ATTENTION!
Risk of damage caused by improper connection of
lines!
Fixed supply lines will transfer vibrations to the
building. Vibrations may damage the supply lines.
A
Only use flexible lines for all the lines connected to
the generation unit.
A
Pay close attention when matching the lines and
connections.
MSM filter
The MSM filter must be installed so that the following
requirements are fulfilled:
B
Installation near the buffer tank.
B
Connection must be made such that a 5-litre vessel
can be placed underneath to catch water. An
elevation elbow (optionally available) can be used if
required.
B
The arrow on the filter head points in the direction
of flow.
B
Horizontal installation of the filter head.
B
Installation of a valve upstream and downstream
from the KMS filter.
MSM filter manual.
A
Connect the line to the “Buffer water return line”
connection on the generation unit.
A
Connect the line to the MSM filter.
MSM filter manual.
Buffer water return line
A
Connect the line to the return line of the buffer tank.
A
Connect the line to the MSM filter.
MSM filter manual.
Buffer water supply line
A
Connect the line to the supply line of the buffer tank.
A
Connect the line to the “Buffer water supply line”
connection on the generation unit.
In order to incorporate into the heating circuit:
A
First open the valve in the return line.
A
Check the sealing.
A
Then open the valve in the supply line.
A
Check the sealing again.