Complete the Job - 142
RT70 Operator’s Manual
Restore Jobsite
Restore Jobsite
After product is installed, return spoils to the
trench with optional backfill blade.
1. Position machine at end of trench, several
feet from spoils. Aim tractor at outer edge of
spoils.
2. Adjust backfill blade to fit land contour.
3. Move outer edge of spoils toward trench.
Take two or more passes at spoils rather than
moving all spoils at once.
4. Repeat on other side of trench, if needed.
5. Engage float and make final pass over trench.
Rinse Equipment
Spray water onto equipment to remove dirt and mud.
Stow Tools
Ensure tools and accessories are loaded and properly secured on trailer or truck.
NOTICE:
• Never spray water onto operator’s console or electrical center in engine compartment. Water can
damage electrical components. Wipe down instead.
• Ensure all mud and debris is rinsed from operator’s station floor.
• Ensure all mud and debris is rinsed from tracks before parking overnight.
Summary of Contents for RT70
Page 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Page 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Page 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Page 83: ...Controls 82 RT70 Operator s Manual Seat ...
Page 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Page 97: ...Transport 96 RT70 Operator s Manual Haul ...
Page 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Page 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Page 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Page 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Page 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...