Maintenance - 154
RT70 Operator’s Manual
Tractor Procedures
Charge
1. Park service vehicle close to disabled
machine but do not allow vehicles to touch.
2. Set parking brake in both, if equipped.
3. Turn ignition switch off in both vehicles and
turn off all electrical loads.
4. Disconnect machine controller.
5. Inspect battery in disabled machine (B) for
signs of cracking, bulging, leaking, or other
damage.
6. Connect red positive (+) jumper cable clamp
to positive (+) post of battery (A) in disabled
machine.
7. Connect the other red positive (+) jumper
cable clamp to positive (+) post of battery (A)
in service vehicle.
8. Connect black negative (-) cable clamp to
negative (-) post of battery (A) in service
vehicle.
9. Connect the other black negative (-) cable clamp to engine or frame ground on disabled vehicle, at
least 12” (305 mm) from failed battery, as shown.
10. Operate service vehicle engine at 1500-2000 rpm for a few minutes to build an electrical charge in
failed battery.
11. Stop engine in service vehicle.
12. Remove jumper cables from service vehicle, black negative (-) clamp first. Do not allow clamps to
touch.
13. Remove black negative (-) cable clamp from disabled engine or frame ground.
14. Remove red positive (+) cable clamp from disabled machine.
15. Reconnect machine controller.
16. Start disabled machines.
IMPORTANT:
Some machines may
have a positive jumper cable terminal
(1) located externally. If so equipped,
connect red positive (+) jumper cable
clamp to terminal.
Summary of Contents for RT70
Page 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Page 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Page 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Page 83: ...Controls 82 RT70 Operator s Manual Seat ...
Page 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Page 97: ...Transport 96 RT70 Operator s Manual Haul ...
Page 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Page 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Page 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Page 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Page 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...