RT70 Operator’s Manual
Transport - 93
Haul
Traversing Trencher
Lower attachment to trailer bed and chain at
attachment frame and through boom. Ensure
chains are tight before transporting.
Reel Carrier
Lower attachment to lowest position as shown.
Plow
Lower attachment to trailer bed and chain at
attachment frame and vibrator box. Ensure chains
are tight before transporting.
IMPORTANT:
If trencher is equipped with a
trench cleaner, ensure that trench cleaner shoe
is fully raised and extra bolt (found in
operator’s manual compartment) is installed in
appropriate hole for additional support.
NOTICE:
Engage attachment stow lock and
swing lock devices in addition to securing at
tiedowns.
t63om021h21.eps
t63om021h21.eps
t63om022h21.eps
t63om022h21.eps
t63om023h21.eps
t63om023h21.eps
Summary of Contents for RT70
Page 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Page 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Page 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Page 83: ...Controls 82 RT70 Operator s Manual Seat ...
Page 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Page 97: ...Transport 96 RT70 Operator s Manual Haul ...
Page 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Page 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Page 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Page 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Page 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...