12 Accessory change by direct coupling
109
Note
Make sure to install the swivel pin stops
correctly by positioning them with the flat
plane against the stop.
8. Grease the hinged parts.
Special features concerning the hammers
1. Connect the coupled hoses from the hammer to the machine connections.
14 Implementing the 3rd hydraulic circuit, page 112
2. In the absence of quick couplers, remove the plugs from the hoses on the machine and drain
the oil accumulated in the hoses.
Always drain the machine's oil into a safe container and never directly onto the ground.
3. Connect ports A and P, then ports B and T with hydraulic hoses.
12.2.1 Loading bucket
IMPORTANT
Protect the various elements from dirt and dust.
Take care not to damage seals on each bushing side.
1 = Arm
2 = Bucket link
1.
Clean and lubricate the bores.
2. Put the o-rings in place.
3. Align the pin bore with the bucket A bore.
Add shims to compensate for play if necessary.
4. Insert the swivel pin into bore A.
Summary of Contents for SV26
Page 3: ......
Page 5: ......
Page 7: ......
Page 9: ......
Page 17: ......
Page 19: ...2 ...
Page 24: ...3 Warning labels 7 3 1 Location of the warning adhesive labels ...
Page 25: ...3 Warning labels 8 ...
Page 75: ...58 ...
Page 115: ...9 Rubber tracks 98 9 6 Track replacement 6 4 2 Track replacement page 149 ...
Page 145: ...128 ...
Page 175: ...158 ...
Page 179: ...162 ...
Page 181: ...164 ...
Page 187: ...170 ...
Page 200: ...C Notes 183 ...
Page 204: ...MINI EXCAVATOR http www yanmar eu ...
Page 205: ...MINI EXCAVATOR SV26 USER OPERATION AND MAINTENANCE MANUAL ...