13
LEFT WALL
FRONT WALL
RIGHT WALL
BACK WALL
Check that the floor frame is level after installing floor panels.
Re-level if needed.
HINT:
IMPORTANT!
• The floor should be used as a stable work surface for wall construction.
• Organize your assembly procedure during the build process
to avoid over-handling of the walls.