45
FRONT GABLE PANELS
PARTS REQUIRED:
Primed
side up
Primed
side up
VENT
HOLE
UV
UV
UV
3
4
5
Place gable center panel (use panel with vent hole) fl ush to installed left panel.
Secure panel to
UV
using 1-1/2" nails.
Place right gable panel fl ush to installed center panel. Ensure panels are fl ush.
Secure panel to
UV
using 1-1/2" nails.
You have fi nished assembling your front gable unit.
FINISH
Flush
Flush
Maintain
Flush
Maintain
Flush
1-3/4"
(4,5 cm)
1-1/2"
(3,8 cm)
Nails
1-1/2" (3,8 cm)
Nails
Fig. A Measurement
Place second
UV
as shown under center panel as shown.
Transfer the measurement from STEP - 1,
Fig. A
onto the left front gable panel.
Secure panel to
UV
using 1-1/2" nails.