53
PARTS REQUIRED:
FRONT GABLE SOFFITS
Position
73-5/16"
overhang board
Primed Side Down
fl ush to front wall
(Fig A)
and to
center of gable assembly
(Fig B)
. Secure using (20) 2" fi nish nails.
Position
73-5/16"
overhang board
Primed Side Down
fl ush to front wall
(Fig. C, Fig. D)
.
Secure using (20) 2" fi nish nails.
Ensure soffi t boards are fl ush at peak and to each other (Fig. B, Fig. D)
.
x4
3/8 x 7-7/8 x 73-5/16" (1 x 20 x 186,2 cm)
x40
2" (5,1 cm)
2
1
BEGIN
You have fi nished installing your soffi t panels.
FINISH
Primed Side Down
Flush to wall.
Fig.C
Center and Flush
at peak.
Fig. D
8"
(20,3 cm)
Primed Side Down
Flush to wall.
Fig. A
Fig. B
8"
(20,3 cm)
2" (5,1 cm) Nails
x20 per side
Flush
to center
Flush
Flush
Gable Overhang
Assembly